Techno-economic optimization and off-design analysis of CO2 purification units for cement plants with oxyfuel-based CO2 capture

被引:20
|
作者
Magli, Francesco [1 ,2 ]
Spinelli, Maurizio [3 ]
Fantini, Martina [3 ]
Romano, Matteo Carmelo [1 ]
Gatti, Manuele [1 ]
机构
[1] Politecn Milan, DOE, Via Lambruschini 4, I-20156 Milan, Italy
[2] Buzzi Unicem SpA, Via Luigi Buzzi 6, I-15033 Casale Monferrato, Italy
[3] Lab Energia & Ambiente Piacenza LEAP, Via Nino Bixio 27-C, I-29121 Piacenza, Italy
基金
中国国家自然科学基金; 欧盟地平线“2020”;
关键词
CO2 purification unit; CO2; capture; Oxyfuel; Calcium looping; Cement decarbonization; FUEL COMBUSTION TECHNOLOGY; CARBON CAPTURE; NUMERICAL OPTIMIZATION; LOOPING PROCESS; COMPRESSION; STATE; INTEGRATION;
D O I
10.1016/j.ijggc.2022.103591
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
This paper evaluates the technical and economic performance, as well as the direct/indirect CO2 emissions of the CO2 Purification Unit (CPU) for cement plants equipped with oxyfuel-based CO2 capture. Two configurations, targeting two different outlet CO2 specifications ('moderate' 95% purity and 'high' 99.9% purity) are designed, modelled and optimized in order to minimize the incremental clinker production cost for different values of the carbon tax. Mass and energy balances are simulated with Aspen Plus, while the operating conditions are numerically optimized with Matlab. Results show that moderate purity can be achieved with an increased cost of clinker of 16.3 euro/tclk (CO2 recovery 99.3%), while the base high purity configuration leads to a 19.3 euro/tclk increase (CO2 recovery 96.1%). Sensitivity analyses are carried out on design parameters (fuel and air infiltrations in the oxyfuel calciner line) and exogenous factors (carbon tax, CO2 intensity of electricity). Air infiltration rate has the highest impact on the incremental cost of clinker (increased by 25% when air leakage grows from 0 to 10%) and on the selection of optimal operational conditions. Off-design analyses aimed at assessing the impact of air infiltration changing over time highlight the relevance of designing the CPU for the scenario with air infiltrations, while selecting reasonable temperature differences (e.g. 5K) to avoid operability issues in the cold box heat exchanger. For the base case CPU, the cost of clinker increases by 3 euro/tclk when moving from zero to 10% air infiltration.
引用
收藏
页数:18
相关论文
共 50 条
  • [41] Techno-Economic Evaluation of Biomass Fired or Co-Fired Power Plants with Post Combustion CO2 Capture
    Domenichini, Rosa
    Gasparini, Franco
    Cotone, Paolo
    Santos, Stanley
    10TH INTERNATIONAL CONFERENCE ON GREENHOUSE GAS CONTROL TECHNOLOGIES, 2011, 4 : 1851 - 1860
  • [42] The cost of impurities: A techno-economic assessment on conditioning of captured CO2 to commercial specifications
    Jensen, Ebbe Hauge
    Pedersen, Rikke Cilius
    Loge, Isaac Appelquist
    Dlamini, Gcinisiawe Msimisi
    Neerup, Randi
    Riber, Christian
    Elmegaard, Brian
    Jensen, Jonas Kjaer
    Fosbol, Philip Loldrup
    INTERNATIONAL JOURNAL OF GREENHOUSE GAS CONTROL, 2025, 141
  • [43] Techno-economic evaluation of using biomass-fired auxiliary units for supplying energy requirements of CO2 capture in coal-fired power plants
    Khorshidi, Zakieh
    Ho, Minh T.
    Wiley, Dianne E.
    INTERNATIONAL JOURNAL OF GREENHOUSE GAS CONTROL, 2015, 32 : 24 - 36
  • [44] Hydrophobic physical solvents for pre-combustion CO2 capture: Experiments, computational simulations, and techno-economic analysis
    Siefert, N. S.
    Agarwal, S.
    Shi, F.
    Shi, W.
    Roth, E. A.
    Hopkinson, D.
    Kusuma, V. A.
    Thompson, R. L.
    Luebke, D. R.
    Nulwala, H. B.
    INTERNATIONAL JOURNAL OF GREENHOUSE GAS CONTROL, 2016, 49 : 364 - 371
  • [45] Techno-economic evaluation of co-firing biomass gas with natural gas in existing NGCC plants with and without CO2 capture
    Khorshidi, Zakieh
    Florin, Nick H.
    Ho, Minh T.
    Wiley, Dianne E.
    INTERNATIONAL JOURNAL OF GREENHOUSE GAS CONTROL, 2016, 49 : 343 - 363
  • [46] Techno-economic assessment of retrofitting indirect-heated calcium looping using coal and biomass as fuels into an existing cement plant for CO2 capture
    Yin, Junjun
    Li, Chao'en
    Paicu, Gabriel
    Su, Shi
    GAS SCIENCE AND ENGINEERING, 2024, 123
  • [47] On the off-design of a natural gas-fired combined cycle with CO2 capture
    Möller, BF
    Genrup, M
    Assadi, M
    Proceedings of ECOS 2005, Vols 1-3: SHAPING OUR FUTURE ENERGY SYSTEMS, 2005, : 811 - 818
  • [48] Physical solvents and techno-economic analysis for pre-combustion CO2 capture: A review
    Smith, Kathryn H.
    Ashkanani, Husain E.
    Morsi, Badie I.
    Siefert, Nicholas S.
    INTERNATIONAL JOURNAL OF GREENHOUSE GAS CONTROL, 2022, 118
  • [49] Techno-Economic Analysis of Mineralization and Utilization of CO2 in Recycled Concrete Aggregates
    Goh, Wayne
    Ye, Suming
    Yong, Roy Ou
    Tham, Kit Huan
    Wang, Cun
    Tao, Longgang
    Cheng, Shuying
    PROCESSES, 2025, 13 (02)
  • [50] Techno-Economic Assessment Guidelines for CO2 Utilization
    Zimmermann, Arno W.
    Wunderlich, Johannes
    Mueller, Leonard
    Buchner, Georg A.
    Marxen, Annika
    Michailos, Stavros
    Armstrong, Katy
    Naims, Henriette
    McCord, Stephen
    Styring, Peter
    Sick, Volker
    Schomaecker, Reinhard
    FRONTIERS IN ENERGY RESEARCH, 2020, 8 (08):