An enhanced model for the integrated production and transportation problem in a multiple vehicles environment

被引:21
|
作者
Kang, He-Yau [1 ]
Pearn, W. L. [2 ]
Chung, I-Ping [2 ]
Lee, Amy H. I. [3 ]
机构
[1] Natl Chin Yi Univ Technol, Dept Ind Engn & Management, Taichung, Taiwan
[2] Natl Chiao Tung Univ, Dept Ind Engn & Management, Hsinchu, Taiwan
[3] Chung Hua Univ, Dept Technol Management, Hsinchu, Taiwan
关键词
Semiconductor manufacturing; Turnkey service; Production and transportation problem; Mixed integer linear programming; Genetic algorithm; HYBRID GENETIC ALGORITHM; TIME; DISCOUNT; SCHEME;
D O I
10.1007/s00500-015-1595-7
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Solving an integrated production and transportation problem (IPTP) is a very challenging task in semiconductor manufacturing with turnkey service. A wafer fabricator needs to coordinate with outsourcing factories in the processes including circuit probing testing, integrated circuit assembly, and final testing for buyers. The jobs are clustered by their product types, and they must be processed by groups of outsourcing factories in various stages in the manufacturing process. Furthermore, the job production cost depends on various product types and different outsourcing factories. Since the IPTP involves constraints on job clusters, job-cluster dependent production cost, factory setup cost, process capabilities, and transportation cost with multiple vehicles, it is very difficult to solve when the problem size becomes large. Therefore, heuristic tools may be necessary to solve the problem. In this paper, we first formulate the IPTP as a mixed integer linear programming problem to minimize the total production and transportation cost. An efficient genetic algorithm (GA) is proposed next to tackle the problem when it becomes too complicated. The objectives are to minimize total costs, where the costs include production cost and transportation cost, under the environment with backup capacities and multiple vehicles, and to determine an appropriate production and distribution plan. The results demonstrate that the proposed GA model is an effective and accurate tool.
引用
收藏
页码:1415 / 1435
页数:21
相关论文
共 50 条
  • [1] An enhanced model for the integrated production and transportation problem in a multiple vehicles environment
    He-Yau Kang
    W. L. Pearn
    I-Ping Chung
    Amy H. I. Lee
    Soft Computing, 2016, 20 : 1415 - 1435
  • [2] A Heuristic Algorithm for Integrated Production and Transportation Scheduling with Multiple Transportation Modes
    Chen, Longchao
    Yang, Jing
    Guo, Zhaoxia
    2015 12TH INTERNATIONAL CONFERENCE ON SERVICE SYSTEMS AND SERVICE MANAGEMENT (ICSSSM), 2015,
  • [3] The synchronised asymmetric multiple travelling salesman problem in a job shop with transportation environment
    Zhang, Hui
    Si, Pengju
    Fu, Yaping
    JOURNAL OF CONTROL AND DECISION, 2025,
  • [4] Solving the integrated scheduling of production and rail transportation problem by Keshtel algorithm
    Hajiaghaei-Keshteli, M.
    Aminnayeri, M.
    APPLIED SOFT COMPUTING, 2014, 25 : 184 - 203
  • [5] An integrated production and transportation scheduling problem with order acceptance and resource allocation decisions
    Aminzadegan, Sajede
    Tamannaei, Mohammad
    Fazeli, Majid
    APPLIED SOFT COMPUTING, 2021, 112
  • [6] Integrated inventory-transportation model by synchronizing delivery and production cycles
    Lee, Y. C. E.
    Chan, Chi Kin
    Langevin, A.
    Lee, H. W. J.
    TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2016, 91 : 68 - 89
  • [7] Simultaneous Production and Transportation Problem: A Case of Additive Manufacturing
    Dwivedi, Gourav
    Chakraborty, Shuvabrata
    Agarwal, Yogesh K.
    Srivastava, Rajiv K.
    TRANSPORTATION SCIENCE, 2023, 57 (03) : 741 - 755
  • [8] An Enhanced Approach for the Multiple Vehicle Routing Problem with Heterogeneous Vehicles and a Soft Time Window
    Kang, He-Yau
    Lee, Amy H., I
    SYMMETRY-BASEL, 2018, 10 (11):
  • [9] An integrated production-distribution planning with a routing problem and transportation cost discount in a supply chain
    Karimi, Behzad
    Ghare Hassanlu, Mahsa
    Niknamfar, Amir Hossein
    ASSEMBLY AUTOMATION, 2019, 39 (05) : 783 - 802
  • [10] Integrated Production and Transportation Scheduling on Parallel Batch-Processing Machines
    Feng, Xin
    Xu, Zhongyue
    IEEE ACCESS, 2019, 7 : 148393 - 148400