Multidimensional behavioral responses to the implementation of BIM in construction projects: an empirical study in China

被引:27
作者
Cao, Dongping [1 ]
Shao, Shiting [1 ]
Huang, Bin [2 ]
Wang, Guangbin [1 ]
机构
[1] Tongji Univ, Dept Construct Management & Real Estate, Shanghai, Peoples R China
[2] Shanghai Lujiazui Finance & Trade Zone Dev Co Ltd, Shanghai, Peoples R China
基金
中国国家自然科学基金;
关键词
Building information modeling (BIM); Construction projects; Technology acceptance; Technology resistance; Chinese construction industry; BUILDING INFORMATION MODEL; USER RESISTANCE; TECHNOLOGY; ADOPTION; ANTECEDENTS; ACCEPTANCE; CAPABILITIES; PERCEPTIONS; ATTITUDES; DESIGN;
D O I
10.1108/ECAM-09-2020-0735
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Purpose Despite its great potential to improve the sustainability of architectural, engineering, construction and facility management activities, the implementation of building information modeling (BIM) in many projects has failed to achieve expected benefits due to negative behavioral responses such as user resistance. This paper aims to characterize the complexity of end user's behavioral responses to BIM implementation in construction projects using a multidimensional perspective and examines how these responses are impacted by different levels of contextual factors. Design/methodology/approach By integrating technology acceptance, resistance and adoption literature, this paper theoretically proposes a research model to characterize the associations between different dimensions of behavioral responses and different levels of contextual factors. The model is then empirically tested with survey and interview data collected from BIM-based construction projects in China. Findings The empirical results not only validate the two-dimensional view of the behavioral responses (i.e. the dimension of support/resistance that ranges from aggressive resistance to enthusiastic support, and the dimension of actual use that ranges from non-use to high use) but also provide evidence for the prevalence of ambivalent responses such as supporting but lowly using and resisting but highly using. The empirical results also provide evidence that different levels of contextual factors generally play different roles in shaping the behavioral responses. Specifically, the dimension of support/resistance is more substantially impacted by the team-level factor while the dimension of actual use of BIM is more significantly associated with the project-level factor. Originality/value While previous research on BIM adoption or implementation behaviors has primarily focused on investigating users' response from single-dimension perspectives such as acceptance or non-acceptance, this study represents an exploratory effort of using a two-dimensional view to characterize the complexity and ambivalence of end users' behavioral responses to the implementation of innovative technologies such as BIM in construction projects. This study also contributes to deepened understandings of how these different dimensions of behavioral responses are intricately shaped by different levels (i.e. individual-, team- and project-levels) of contextual factors in construction projects which are characterized as temporary and inter-organizational.
引用
收藏
页码:819 / 841
页数:23
相关论文
共 76 条
  • [31] Areas of application for 3D and 4D models on construction projects
    Hartmann, Timo
    Gao, Ju
    Fischer, Martin
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2008, 134 (10) : 776 - 785
  • [32] Hatcher L.A., 2003, Step-By-Step Approach to Using the SAS System for Factor Analysis and Structural Equation Modeling, V6th
  • [33] Addressing individual perceptions: An application of the unified theory of acceptance and use of technology to building information modelling
    Howard, Robert
    Restrepo, Luis
    Chang, Chen-Yu
    [J]. INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2017, 35 (02) : 107 - 120
  • [34] Safeguarding interorganizational performance and continuity under ex post opportunism
    Jap, SD
    Anderson, E
    [J]. MANAGEMENT SCIENCE, 2003, 49 (12) : 1684 - 1701
  • [35] User resistance and strategies for promoting acceptance across system types
    Jiang, JJ
    Muhanna, WA
    Klein, G
    [J]. INFORMATION & MANAGEMENT, 2000, 37 (01) : 25 - 36
  • [36] Empirical Study of BIM Implementation-Based Perceptions among Chinese Practitioners
    Jin, Ruoyu
    Hancock, Craig
    Tang, Llewellyn
    Chen, Chao
    Wanatowski, Dariusz
    Yang, Lin
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2017, 33 (05)
  • [37] Kim HW, 2009, MIS QUART, V33, P567
  • [38] Lapointe L, 2005, MIS QUART, V29, P461
  • [39] Lee S., 2016, J CONSTR ENG M, V142
  • [40] BIM Acceptance Model in Construction Organizations
    Lee, Seulki
    Yu, Jungho
    Jeong, David
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2015, 31 (03)