Multidimensional behavioral responses to the implementation of BIM in construction projects: an empirical study in China

被引:27
作者
Cao, Dongping [1 ]
Shao, Shiting [1 ]
Huang, Bin [2 ]
Wang, Guangbin [1 ]
机构
[1] Tongji Univ, Dept Construct Management & Real Estate, Shanghai, Peoples R China
[2] Shanghai Lujiazui Finance & Trade Zone Dev Co Ltd, Shanghai, Peoples R China
基金
中国国家自然科学基金;
关键词
Building information modeling (BIM); Construction projects; Technology acceptance; Technology resistance; Chinese construction industry; BUILDING INFORMATION MODEL; USER RESISTANCE; TECHNOLOGY; ADOPTION; ANTECEDENTS; ACCEPTANCE; CAPABILITIES; PERCEPTIONS; ATTITUDES; DESIGN;
D O I
10.1108/ECAM-09-2020-0735
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Purpose Despite its great potential to improve the sustainability of architectural, engineering, construction and facility management activities, the implementation of building information modeling (BIM) in many projects has failed to achieve expected benefits due to negative behavioral responses such as user resistance. This paper aims to characterize the complexity of end user's behavioral responses to BIM implementation in construction projects using a multidimensional perspective and examines how these responses are impacted by different levels of contextual factors. Design/methodology/approach By integrating technology acceptance, resistance and adoption literature, this paper theoretically proposes a research model to characterize the associations between different dimensions of behavioral responses and different levels of contextual factors. The model is then empirically tested with survey and interview data collected from BIM-based construction projects in China. Findings The empirical results not only validate the two-dimensional view of the behavioral responses (i.e. the dimension of support/resistance that ranges from aggressive resistance to enthusiastic support, and the dimension of actual use that ranges from non-use to high use) but also provide evidence for the prevalence of ambivalent responses such as supporting but lowly using and resisting but highly using. The empirical results also provide evidence that different levels of contextual factors generally play different roles in shaping the behavioral responses. Specifically, the dimension of support/resistance is more substantially impacted by the team-level factor while the dimension of actual use of BIM is more significantly associated with the project-level factor. Originality/value While previous research on BIM adoption or implementation behaviors has primarily focused on investigating users' response from single-dimension perspectives such as acceptance or non-acceptance, this study represents an exploratory effort of using a two-dimensional view to characterize the complexity and ambivalence of end users' behavioral responses to the implementation of innovative technologies such as BIM in construction projects. This study also contributes to deepened understandings of how these different dimensions of behavioral responses are intricately shaped by different levels (i.e. individual-, team- and project-levels) of contextual factors in construction projects which are characterized as temporary and inter-organizational.
引用
收藏
页码:819 / 841
页数:23
相关论文
共 76 条
  • [11] The project benefits of Building Information Modelling (BIM)
    Bryde, David
    Broquetas, Marti
    Volm, Juergen Marc
    [J]. INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2013, 31 (07) : 971 - 980
  • [12] Reconceptualizing system usage: An approach and empirical test
    Burton-Jones, Andrew
    Straub, Detmar W., Jr.
    [J]. INFORMATION SYSTEMS RESEARCH, 2006, 17 (03) : 228 - 246
  • [13] Identifying and contextualising the motivations for BIM implementation in construction projects: An empirical study in China
    Cao, Dongping
    Li, Heng
    Wang, Guangbin
    Huang, Ting
    [J]. INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2017, 35 (04) : 658 - 669
  • [14] Practices and effectiveness of building information modelling in construction projects in China
    Cao, Dongping
    Wang, Guangbin
    Li, Heng
    Skitmore, Martin
    Huang, Ting
    Zhang, Weiyu
    [J]. AUTOMATION IN CONSTRUCTION, 2015, 49 : 113 - 122
  • [15] Impacts of Isomorphic Pressures on BIM Adoption in Construction Projects
    Cao, Dongping
    Li, Heng
    Wang, Guangbin
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2014, 140 (12)
  • [16] Supply chain collaboration: Impact on collaborative advantage and firm performance
    Cao, Mei
    Zhang, Qingyu
    [J]. JOURNAL OF OPERATIONS MANAGEMENT, 2011, 29 (03) : 163 - 180
  • [17] Perceived benefits of and barriers to Building Information Modelling (BIM) implementation in construction: The case of Hong Kong
    Chan, Daniel W. M.
    Olawumi, Timothy O.
    Ho, Alfred M. L.
    [J]. JOURNAL OF BUILDING ENGINEERING, 2019, 25
  • [18] Adoption of building information modeling in Chinese construction industry The technology-organization-environment framework
    Chen, Yilin
    Yin, Yilin
    Browne, Glenn J.
    Li, Dahui
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2019, 26 (09) : 1878 - 1898
  • [19] Do peers make the place? Conceptual synthesis and meta-analysis of coworker effects on perceptions, attitudes, OCBs, and performance
    Chiaburu, Dan S.
    Harrison, David A.
    [J]. JOURNAL OF APPLIED PSYCHOLOGY, 2008, 93 (05) : 1082 - 1103
  • [20] A mixed review of the adoption of Building Information Modelling (BIM) for sustainability
    Chong, Heap-Yih
    Lee, Cen-Ying
    Wang, Xiangyu
    [J]. JOURNAL OF CLEANER PRODUCTION, 2017, 142 : 4114 - 4126