Performance evaluation of seven optimization models of age replacement policy

被引:12
作者
Jiang, R. [1 ]
机构
[1] Changsha Univ Sci & Technol, Fac Automot & Mech Engn, Changsha 410114, Hunan, Peoples R China
关键词
Age replacement policy; Optimization model; Performance evaluation; Model selection; PREVENTIVE MAINTENANCE;
D O I
10.1016/j.ress.2018.07.030
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Several optimization models of the classic age replacement policy have been developed based on different optimality criteria in the literature. This raises the issue how to choose an appropriate model among these models for a specific application. This paper addresses this issue by carrying out a comparative study for the performances of these models and a new risk-sensitive cost model. The performance of the solution of an optimization model is evaluated from two aspects: cost (or availability) and reliability. Two benchmarking points that correspond to these two aspects are defined; and three performance measures that correspond to cost, reliability and overall performance, respectively, are developed for evaluating the performances of the models. Through quantitatively comparing the performances of the models' solutions associated with the Weibull, gamma and lognormal distributions, the models with outstanding performances are identified. The applicable situations of the outstanding models are also discussed. The results are useful for both maintenance researchers and practitioners.
引用
收藏
页码:302 / 311
页数:10
相关论文
共 34 条
[1]   An overview of time-based and condition-based maintenance in industrial application [J].
Ahmad, Rosmaini ;
Kamaruddin, Shahrul .
COMPUTERS & INDUSTRIAL ENGINEERING, 2012, 63 (01) :135-149
[2]   OPTIMAL RANDOM AGE REPLACEMENT FOR AVAILABILITY [J].
Angus, John E. ;
Yin, Meng-Lai ;
Trivedi, Kishor .
INTERNATIONAL JOURNAL OF RELIABILITY QUALITY & SAFETY ENGINEERING, 2012, 19 (05)
[3]  
[Anonymous], 2016 2 INT S STOCH M
[4]  
[Anonymous], 1987, Introduction to Quality Engineering: Designing Quality into Products and Processes
[5]  
[Anonymous], 2008, MAINTENANCE DECISION
[6]  
[Anonymous], ENG ASSET MANAGEMENT
[7]   AGE REPLACEMENT UNDER ALTERNATIVE COST CRITERIA [J].
ANSELL, J ;
BENDELL, A ;
HUMBLE, S .
MANAGEMENT SCIENCE, 1984, 30 (03) :358-367
[8]   OPTIMUM PREVENTIVE MAINTENANCE POLICIES [J].
BARLOW, R ;
HUNTER, L .
OPERATIONS RESEARCH, 1960, 8 (01) :90-100
[9]  
Chen Y, 2003, IIE TRANS, V35, P1091, DOI 10.1080/07408170390237162
[10]   REFINED ASYMPTOTIC COSTS FOR RENEWAL REWARD PROCESSES [J].
CHRISTER, AH .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1978, 29 (06) :577-583