共 50 条
- [1] Optimal operation scheduling of an adjustable-blade pumping station in the East Route of South-to-North Water Diversion Project Shuili Xuebao/Journal of Hydraulic Engineering, 2016, 47 (10): : 1332 - 1338
- [5] Optimal Operation Scheduling of Multiple Pump Units on variable speed operation with VFD in the East Route of South-to-North Water Diversion Project PROCEEDINGS OF THE 36TH CHINESE CONTROL CONFERENCE (CCC 2017), 2017, : 2818 - 2823
- [6] Study on source pump station optimal operation of first-stage Eastern Route of South-to-North Water Diversion Project Shuili Fadian Xuebao/Journal of Hydroelectric Engineering, 2008, 27 (04): : 48 - 53
- [7] Consideration on Western Route Project for South-to-North Water Diversion PROCEEDINGS OF THE 4TH INTERNATIONAL YELLOW RIVER FORUM ON ECOLOGICAL CIVILIZATION AND RIVER ETHICS, VOL II, 2010, : 281 - 286
- [8] Sustainable Integrated Water Management DSS for East Route and Middle Route of South-to-North Water Diversion Project PROCEEDINGS OF THE 3RD INTERNATIONAL YELLOW RIVER FORUM ON SUSTAINABLE WATER RESOURCES MANAGEMENT AND DELTA ECOSYSTEM MAINTENANCE, VOL V, 2007, : 114 - +
- [10] Operation Mode of Danjiangkou Reservoir under Water Diversion Conditions of South-to-North Water Diversion Middle Route Project 2018 3RD ASIA CONFERENCE ON POWER AND ELECTRICAL ENGINEERING (ACPEE 2018), 2018, 366