A robust optimization approach for integrated steel production and batch delivery scheduling with uncertain rolling times and deterioration effect

被引:38
作者
Kong, Min [1 ,2 ,3 ]
Pei, Jun [1 ,3 ,4 ]
Xu, Jin [2 ]
Liu, Xinbao [1 ,3 ]
Yu, Xiaoyu [5 ]
Pardalos, Panos M. [4 ]
机构
[1] Hefei Univ Technol, Sch Management, Hefei, Anhui, Peoples R China
[2] Texas A&M Univ, Dept Ind & Syst Engn, College Stn, TX USA
[3] Minist Educ, Key Lab Proc Optimizat & Intelligent Decis Making, Hefei, Anhui, Peoples R China
[4] Univ Florida, Dept Ind & Syst Engn, Ctr Appl Optimizat, Gainesville, FL 32611 USA
[5] Harbin Univ Sci & Technol, Sch Measurement & Commun, Harbin, Heilongjiang, Peoples R China
基金
中国国家自然科学基金;
关键词
production and delivery; uncertain rolling times; deteriorating jobs; batch delivery; IVNS; INTERVAL PROCESSING TIMES; DUE-DATE ASSIGNMENT; 2-MACHINE FLOWSHOP; GENETIC ALGORITHM; STEELMAKING; SHOP; JOBS; SEARCH; MODEL;
D O I
10.1080/00207543.2019.1693659
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Efficient collaboration between various sub-processes of steel production is of considerable significance, which directly affects a product's production cycle and energy consumption. However, current collaborative optimisation models and methods in steel production are still limited: (1) Most of the current collaborative manufacturing problems in steel production focus on obtaining joint schedule between steel-making and continuous casting (SCC), and the works considering continuous casting and hot rolling (CCHR) are very few. (2) The processing time is assumed as a constant in most of the existing SCC scheduling models. However, the rolling time of a product in hot rolling operation is actually uncertain and deteriorating. (3) Exact algorithms cannot be applied to solve the complicated collaborative optimisation problems because of their high complexities. To address these problems, we propose an integrated CCHR and batch delivery scheduling model where interval rolling time and linear deterioration effect are considered. With the concept of min-max regret value, we formulate the collaborative optimisation problem as a robust optimisation problem. Instead of using the exact algorithm, we develop an Improved Variable Neighborhood Search (IVNS) algorithm incorporated a novel population update mechanism and neighbourhood structures to solve the robust optimisation problem. Moreover, we develop an exact algorithm that combines CPLEX solver and two dynamic programming algorithms to obtain the maximum regret value of a given rolling sequence. The results of computational experiments show the excellent performance of the proposed algorithms.
引用
收藏
页码:5132 / 5154
页数:23
相关论文
共 62 条
[1]   Integrated production scheduling and batch delivery with fixed departure times and inventory holding costs [J].
Agnetis, Alessandro ;
Aloulou, Mohamed Ali ;
Kovalyov, Mikhail Y. .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2017, 55 (20) :6193-6206
[2]  
Alidaee B, 1999, J OPER RES SOC, V50, P711, DOI 10.2307/3010325
[3]   Single machine scheduling problem with interval processing times to minimize mean weighted completion time [J].
Allahverdi, Ali ;
Aydilek, Harun ;
Aydilek, Asiye .
COMPUTERS & OPERATIONS RESEARCH, 2014, 51 :200-207
[4]   Multi-objective fuzzy parallel machine scheduling problems under fuzzy job deterioration and learning effects [J].
Arik, Oguzhan Ahmet ;
Toksari, M. Duran .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2018, 56 (07) :2488-2505
[5]   Modeling and solving the steelmaking and casting scheduling problem [J].
Armellini, Davide ;
Borzone, Paolo ;
Ceschia, Sara ;
Di Gaspero, Luca ;
Schaerf, Andrea .
INTERNATIONAL TRANSACTIONS IN OPERATIONAL RESEARCH, 2020, 27 (01) :57-90
[6]   Algorithms for minimizing the number of tardy jobs for reducing production cost with uncertain processing times [J].
Aydilek, Asiye ;
Aydilek, Harun ;
Allahverdi, Ali .
APPLIED MATHEMATICAL MODELLING, 2017, 45 :982-996
[7]   Production in a two-machine flowshop scheduling environment with uncertain processing and setup times to minimize makespan [J].
Aydilek, Asiye ;
Aydilek, Harun ;
Allahverdi, Ali .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2015, 53 (09) :2803-2819
[8]   Parallel machine scheduling with fuzzy processing times using a robust genetic algorithm and simulation [J].
Balin, Savas .
INFORMATION SCIENCES, 2011, 181 (17) :3551-3569
[9]   Hybrid method with CS and BRKGA applied to the minimization of tool switches problem [J].
Chaves, A. A. ;
Lorena, L. A. N. ;
Senne, E. L. F. ;
Resende, M. G. C. .
COMPUTERS & OPERATIONS RESEARCH, 2016, 67 :174-183
[10]   A concise survey of scheduling with time-dependent processing times [J].
Cheng, TCE ;
Ding, Q ;
Lin, BMT .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2004, 152 (01) :1-13