A validated business process modelling success factors model

被引:13
作者
Bandara, Wasana [1 ]
Gable, Guy Grant [2 ]
Tate, Mary [3 ,4 ]
Rosemann, Michael [5 ]
机构
[1] Queensland Univ Technol, Sch Informat Syst, Business Proc Management BPM Discipline, Brisbane, Qld, Australia
[2] Queensland Univ Technol, Sch Informat Syst, Res, Brisbane, Qld, Australia
[3] Victoria Univ Wellington, Informat Syst, Wellington, New Zealand
[4] Queensland Univ Technol, Sch Informat Syst, Brisbane, Qld, Australia
[5] Queensland Univ Technol, Sch Business, Brisbane, Qld, Australia
关键词
Business process modelling; Success factors; Success measurement; Moderation; Survey research; USER PARTICIPATION; SYSTEM SUCCESS; FORMATIVE MEASUREMENT; PROJECT-MANAGEMENT; INDICATORS; SUPPORT; MIS;
D O I
10.1108/BPMJ-06-2019-0241
中图分类号
F [经济];
学科分类号
02 ;
摘要
Purpose Business process modelling (BPMo) projects are core to digital transformation projects as they provide the conceptual foundation to the orchestration of technologies along a process. Yet, success factors of BPMo projects have received little research attention to date. This study empirically validates a BPMo project success model, pointing to normative practice guidelines and important future research. Design/methodology/approach This research reports on the quantitative re-specification and validation of a business process modelling success model, employing survey responses from 261 process modellers worldwide. Findings The study distilled and validated a final set of success antecedents: Top Management Support, Project Management Capabilities, Stakeholder Input, Modeller Expertise and Modelling Tool Usage; and clearly evidences their relationships with each other and with two moderating variables - Importance and Complexity. The paper offers a nuanced explanation of the indirect role of top management support in building stakeholder involvement and explains how complex projects that are perceived as important being more likely to attract high levels of necessary stakeholder involvement. The authors conclude that top management needs to create an environment of co-ordinated excellence which spans both technical skills and resources, and a high level of committed engagement between stakeholders and technicians in order for BPMo projects to succeed. Originality/value This study is the first to operationalize and quantitatively test antecedents of BPMo project success and their interactions, presenting novel insights into how the success factors interact. Awareness of the more influential antecedents of successful process modelling projects offers valuable guidance for the planning, management and conduct of BPMo projects.
引用
收藏
页码:1522 / 1544
页数:23
相关论文
共 59 条
[1]   A literature review on business process modelling: new frontiers of reusability [J].
Aldin, Laden ;
de Cesare, Sergio .
ENTERPRISE INFORMATION SYSTEMS, 2011, 5 (03) :359-383
[2]   Key antecedents of Executive Information System success: a path analytic approach [J].
Bajwa, DS ;
Rai, A ;
Brennan, I .
DECISION SUPPORT SYSTEMS, 1998, 22 (01) :31-43
[3]  
Bandara, 2007, THESIS QUEENSLAND U
[4]   Factors and measures of business process modelling: model building through a multiple case study [J].
Bandara, W ;
Gable, GG ;
Rosemann, M .
EUROPEAN JOURNAL OF INFORMATION SYSTEMS, 2005, 14 (04) :347-360
[5]  
Bandara W, 2006, INT C INF SYST ICIS
[6]   Establishing Project Portfolio Management: An Exploratory Analysis of the Influence of Internal Stakeholders' Interactions [J].
Beringer, Claus ;
Jonas, Daniel ;
Gemuenden, Hans Georg .
PROJECT MANAGEMENT JOURNAL, 2012, 43 (06) :16-32
[7]  
Brennan, 2009, INT C INF SYST PHOEN
[8]   Reconceptualizing system usage: An approach and empirical test [J].
Burton-Jones, Andrew ;
Straub, Detmar W., Jr. .
INFORMATION SYSTEMS RESEARCH, 2006, 17 (03) :228-246
[10]   Critical Success Factors for Crisis Recovery Management: A Case Study of Phuket Hotels [J].
Campiranon, Kom ;
Scott, Noel .
JOURNAL OF TRAVEL & TOURISM MARKETING, 2014, 31 (03) :313-326