Selection of Resource for Re-assignment of a Job Due to Break Down Failure Under Agent Based Holonic Manufacturing Environment

被引:0
作者
Dutta, Soumik [1 ]
Bairagi, Bipradas [1 ]
Jana, Tarun Kanti [2 ]
机构
[1] Haldia Inst Technol, Dept Prod Engn, Haldia 721657, India
[2] Haldia Inst Technol, Dept Mech Engn, Haldia 721657, India
来源
RECENT ADVANCES IN INTELLIGENT INFORMATION SYSTEMS AND APPLIED MATHEMATICS | 2020年 / 863卷
关键词
MCDM; Holonic manufacturing; Agent based systems; Cognitive; Resource Selection Index; SYSTEMS;
D O I
10.1007/978-3-030-34152-7_43
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Selection of resource for re-assignment of a job due to break down failure under holonic manufacturing environment is very important activity especially while the decision is to make under conflicting subjective criteria. Due to the multiple conflicting criteria and their complexity, selection of proper resource can be considered as a multi criteria decision-making (MCDM) problem. This analysis aims to provide a rationally new approach for resource evaluation and selection that might be a suitable surrogate of the existing methodologies. This paper explores an evaluation algorithm capable of considering subjective criteria. The proposed methodology is illustrated with a suitable example. In the methodology, the subjective measures of performance rating and importance weight are integrated using the proposed logical technique for determination of respective Resource Selection Index (MSI). Resources are ranked in the descending order of their respective RSI values and the resource associated with the highest MSI value is selected as the best one. Finally, the proposed technique is verified with a conventional MCDM tool. This shows that the proposed technique is very simple but extensively effective and extremely applicable in selection of resource under holonic manufacturing environment.
引用
收藏
页码:557 / 566
页数:10
相关论文
共 14 条
[1]   Development and applications of holonic manufacturing systems: a survey [J].
Babiceanu, RF ;
Chen, FF .
JOURNAL OF INTELLIGENT MANUFACTURING, 2006, 17 (01) :111-131
[2]   Fuzzy MCDM approach for selecting the best environment-watershed plan [J].
Chen, Vivien Y. C. ;
Lien, Hui-Pang ;
Liu, Chui-Hua ;
Liou, James J. H. ;
Tzeng, Gwo-Hshiung ;
Yang, Lung-Shih .
APPLIED SOFT COMPUTING, 2011, 11 (01) :265-275
[3]   An integrated approach for facility layout, P/D location and material handling system design [J].
Chittratanawat, S ;
Noble, JS .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1999, 37 (03) :683-706
[4]   A fuzzy TOPSIS method for robot selection [J].
Chu, TC ;
Lin, YC .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2003, 21 (04) :284-290
[5]   An agent-based intelligent control platform for industrial holonic manufacturing systems [J].
Colombo, AW ;
Schoop, R ;
Neubert, R .
IEEE TRANSACTIONS ON INDUSTRIAL ELECTRONICS, 2006, 53 (01) :322-337
[6]   NEGOTIATION AS A METAPHOR FOR DISTRIBUTED PROBLEM-SOLVING [J].
DAVIS, R ;
SMITH, RG .
ARTIFICIAL INTELLIGENCE, 1983, 20 (01) :63-109
[7]   Holons and agents [J].
Giret, A ;
Botti, V .
JOURNAL OF INTELLIGENT MANUFACTURING, 2004, 15 (05) :645-659
[8]   The pursuit of cognition in manufacturing organizations [J].
Nobre, Farley S. ;
Tobias, Andrew M. ;
Walker, David S. .
JOURNAL OF MANUFACTURING SYSTEMS, 2008, 27 (04) :145-157
[9]  
Shen W., 2001, MULTIAGENT SYSTEMS C
[10]   FRAMEWORKS FOR COOPERATION IN DISTRIBUTED PROBLEM-SOLVING [J].
SMITH, RG ;
DAVIS, R .
IEEE TRANSACTIONS ON SYSTEMS MAN AND CYBERNETICS, 1981, 11 (01) :61-70