COMPARISON OF MULTI LAYER PERCEPTRON (MLP) AND RADIAL BASIS FUNCTION (RBF) FOR CONSTRUCTION COST ESTIMATION: THE CASE OF TURKEY

被引:50
作者
Bayram, Savas [1 ]
Ocal, M. Emin [2 ]
Laptali Oral, Emel [2 ]
Atis, C. Duran [1 ]
机构
[1] Erciyes Univ, Dept Civil Engn, TR-38039 Kayseri, Turkey
[2] Cukurova Univ, Dept Civil Engn, TR-01330 Adana, Turkey
关键词
actual cost; construction cost estimation; unit area cost method (UACM); artificial neural networks (ANN); multi layer perceptron (MLP); radial basis function (RBF); ARTIFICIAL NEURAL-NETWORKS;
D O I
10.3846/13923730.2014.897988
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In Turkey, for the preliminary construction cost estimation, a notice, which is updated and published annually by Turkish Ministry of the Environment and Urbanism, known as "unit area cost method" (UACM) is generally employed. However, it's known that the costs obtained through this method in which only construction area is taken into consideration have significant differences from actual costs. The aim of this study is to compare the cost estimations obtained through "multi layer perceptron" (MLP) and "radial basis function" (RBF), which are commonly used artificial neural network (ANN) methods. The results of MLP and RBF were also compared with the results of UACM and the validity of UACM was interpreted. Dataobtained from 232 public construction projects, which completed between 2003 and 2011 in different regions of Turkey, were reviewed. Consequently, estimated costs obtained from RBF were found to be higher than the actual costs with a 0.28% variance, while the estimated costs obtained from MLP were higher than actual values with a 1.11% variance. The approximate costs obtained from UACM are higher than actual costs with a 28.73% variance. It was found that both ANN methods were showed better performance than the UACM but RBF was superior to MLP.
引用
收藏
页码:480 / 490
页数:11
相关论文
共 47 条
[1]   Regularization neural network for construction cost estimation [J].
Adeli, H ;
Wu, MY .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 1998, 124 (01) :18-24
[2]  
Akbilgic O., 2011, THESIS ISTANBUL U IS
[3]  
Akinbingol M., 2005, J FACULTY ENG ARCHIT, V20, P499
[4]  
[Anonymous], 2002, Construction Management Economics
[5]  
[Anonymous], 1999, FEEDFORWARD NEURAL N
[6]  
[Anonymous], 2010, Ege Akademik Bakis
[7]  
[Anonymous], 2009, MATLAB VERS 7 9 0
[8]  
Arafa M., 2011, Journal of Artificial Intelligence, V4, P63, DOI [DOI 10.3923/JAI.2011.63.75, 10.3923/jai.2011.63.75]
[9]  
Arslan O., 2007, 11 TURK HAR BIL VE T
[10]  
Ashworth A., 2010, COST STUDIES BUILDIN, V5th