Addressing renewable energy conundrum in the DR Congo: Focus on Grand Inga hydropower dam project

被引:4
作者
Gnassou, Laure
机构
关键词
Renewable energy; Energy supply; Infrastructure; Political interference; Mining; Electro-mobility;
D O I
10.1016/j.esr.2019.100400
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
As the DR Congo has experienced a severe energy crisis, the paper analyzes its energy policy. It examines the Grand Inga hydropower project, including the Inga 3 dam. The Inga 3 dam's development is confronted with political, geostrategic, and financial challenges, notably the suspension of the World Bank's funding in 2016. Due to the electro-mobility's development, the downstream companies intend to secure cobalt from the country. Mining companies of the copper-cobalt belt might fail to respond to the downstream companies' needs, given the lack of a reliable and affordable energy supply. Policy recommendations suggest that further transparency in implementing the Grand Inga project is required for restoring donors' confidence; while the country strives for political stability and sustainable development.
引用
收藏
页数:6
相关论文
共 25 条
[1]  
[Anonymous], 2016, HUMAN DEV REPORT
[2]  
[Anonymous], HYDR STAT REP 2018 S
[3]  
[Anonymous], 2019, Economic Growth
[4]  
[Anonymous], FINANCIAL TIMES
[5]  
[Anonymous], 2018, WORLD DEV INDICATORS
[6]  
Gielenc Dolf, 2014, GRAND INGA POWER AFR, P1
[7]  
IMF, 2015, 15281 IMF
[8]  
IMF, 2013, 13226 IMF, V13
[9]  
IMF, 2015, 15280 IMF
[10]  
International Hydropower Association, 2017, HYDR STAT REP