Even-aged restrictions with sub-graph adjacency

被引:18
作者
Barrett, TM [1 ]
Gilless, JK
机构
[1] Univ Montana, Sch Forestry, Missoula, MT 59812 USA
[2] Univ Calif Berkeley, Dept Environm Sci Policy & Management, Berkeley, CA 94720 USA
关键词
harvest scheduling; integer programming; tactical planning; heuristic methods;
D O I
10.1023/A:1018993822494
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
Restrictions on the size and proximity of clearcuts have led to the development of a variety of exact and heuristic methods to optimize the net present value of timber harvests, subject to adjacency constraints. Most treat harvest units as pre-defined, and impose adjacency constraints on any two units sharing a common border. By using graph theory notation to define sub-graph adjacency constraints, opening size can be considered variable, which may be more appropriate for landscape-level planning. A small example data set is used in this paper to demonstrate the difference between the two types of adjacency constraints for both integer programming and heuristic solution methods.
引用
收藏
页码:159 / 175
页数:17
相关论文
共 28 条
[1]  
Aigner M., 1987, GRAPH THEORY DEV 4 C
[2]   Voronoi tessellation methods to delineate harvest units for spatial forest planning [J].
Barrett, TM .
CANADIAN JOURNAL OF FOREST RESEARCH-REVUE CANADIENNE DE RECHERCHE FORESTIERE, 1997, 27 (06) :903-910
[3]  
Barrett TM, 1998, FOREST SCI, V44, P569
[4]  
BUONGIORNO J., 1987, FOREST MANAGEMENT EC
[5]  
Chartrand G., 1977, GRAPHS MATH MODELS
[6]   HARVEST SCHEDULING UNDER ADJACENCY CONSTRAINTS - A CASE-STUDY FROM THE SWEDISH SUB-ALPINE REGION [J].
DAHLIN, B ;
SALLNAS, O .
SCANDINAVIAN JOURNAL OF FOREST RESEARCH, 1993, 8 (02) :281-290
[7]  
DAUST DK, 1993, FOREST SCI, V39, P152
[8]  
DAVIS L. S., 1987, Forest management, V3, DOI 10.17058/cp.v27i1.5785
[9]  
Evans J.R., 1992, OPTIMIZATION ALGORIT, V2nd
[10]  
Haken W., 1989, EVERY PLANAR MAP IS