An integrated safety management with construction management using 4D CAD model

被引:118
作者
Benjaoran, Vacharapoom [1 ]
Bhokha, Sdhabhon [2 ]
机构
[1] Suranaree Univ Technol, Inst Engn, Sch Civil Engn, Nakhon Ratchasima, Thailand
[2] Ubon Ratchathani Univ, Fac Engn, Dept Civil Engn, Ubon Ratchathani, Thailand
关键词
Construction safety; Safety management; Integrated safety; 4D CAD model; Working-at-height; HEALTH; DESIGN; PERFORMANCE;
D O I
10.1016/j.ssci.2009.09.009
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper describes an integrated system for safety and construction management using the 4D CAD model. Safety is integrated with the construction management process throughout design, planning and control phases. Design information about building components and planning information about activities has been gathered to formulate the 4D CAD model. The rule-based system analyzes this combined information to automatically detect any working-at-height hazards and also indicates necessary safety measures in terms of activities and requirements. These safety measures are inserted into the construction schedule and visualized on the 4D CAD together with the other construction sequences. A prototype is developed and verified with a project case study. The results show that the developed system can be a collaboration tool for designers, project engineers, safety officers, and other project participants. It can raise safety awareness of the team and it leads to revisions of design and plan to be consistent with safety. Safety measures are apparently on the schedule; therefore, right resources are allocated, safety constraints are considered and alleviated ahead of time, and the safety control can explicitly refer to as well, This contributes to the success of safety management in the construction industry. (C) 2009 Elsevier Ltd. All rights reserved.
引用
收藏
页码:395 / 403
页数:9
相关论文
共 37 条
[1]   Representing work spaces generically in construction method models [J].
Akinci, B ;
Fischer, M ;
Kunz, J ;
Levitt, R .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2002, 128 (04) :296-305
[2]   Formalization and automation of time-space conflict analysis [J].
Akinci, B ;
Fischen, M ;
Levitt, R ;
Carlson, R .
JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2002, 16 (02) :124-134
[3]   Automated generation of work spaces required by construction activities [J].
Akinci, B ;
Fischer, M ;
Kunz, J .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2002, 128 (04) :306-315
[4]   Critical success factors influencing safety program performance in Thai construction projects [J].
Aksorn, Thanet ;
Hadikusumo, B. H. W. .
SAFETY SCIENCE, 2008, 46 (04) :709-727
[5]  
Baxendale T., 2000, International Journal of Project Management, V18, P33, DOI DOI 10.1016/S0263-7863(98)00066-0
[6]   Linking construction fatalities to the design for construction safety concept [J].
Behm, M .
SAFETY SCIENCE, 2005, 43 (08) :589-611
[7]  
*BLS, 2007, FAT WORKPL INJ 2005
[8]  
Cameron I., 2004, 263 RR HLTH SAF EX
[9]   Planning tools for integrating health and safety in construction [J].
Cameron, Iain ;
Hare, Billy .
CONSTRUCTION MANAGEMENT AND ECONOMICS, 2008, 26 (09) :899-909
[10]  
Chang K, 2005, LECT SER COMPUTER CO, V4A-4B, P99