Matheuristics for a parallel machine scheduling problem with non-anticipatory family setup times: Application in the offshore oil and gas industry

被引:15
作者
Abu-Marrul, Victor [1 ]
Martinelli, Rafael [1 ]
Hamacher, Silvio [1 ]
Gribkovskaia, Irina [2 ]
机构
[1] Pontifical Catholic Univ Rio de Janeiro PUC Rio, Marques de Sao Vicente 225, BR-22451900 Rio De Janeiro, RJ, Brazil
[2] Molde Univ Coll, Specialized Univ Logist HiMolde, Britvegen 2, N-6410 Molde, Norway
关键词
Parallel machine scheduling; Family scheduling; Batch scheduling; Matheuristic; Offshore industry logistics; Ship scheduling; MINIMIZING TOTAL TARDINESS; OPTIMIZATION; GRASP;
D O I
10.1016/j.cor.2020.105162
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
In this paper, we address a variant of a batch scheduling problem with identical parallel machines and non-anticipatory family setup times to minimize the total weighted completion time. We developed an ILS and a GRASP matheuristics to solve the problem using a constructive heuristic and two MIPbased neighborhood searches, considering two batch scheduling mathematical formulations. The problem derives from a ship scheduling problem related to offshore oil & gas logistics, the Pipe Laying Support Vessel Scheduling Problem (PLSVSP). The developed methods overcome the current solution approaches in the PLSVSP literature, according to experiments carried out on a benchmark of 72 instances, with different sizes and characteristics, in terms of computational time and solution quality. New best solutions are provided for all medium and large-sized instances, achieving a reduction of more than 10% in the objective function of the best case. (c) 2020 Elsevier Ltd. All rights reserved.
引用
收藏
页数:19
相关论文
共 40 条
[1]  
Abu-Marrul V., 2019, INSTANCES PLSV SCHED, DOI DOI 10.17771/PUCRIO.RESEARCHDATA.45799
[2]   Scheduling pipe laying support vessels with non-anticipatory family setup times and intersections between sets of operations [J].
Abu-Marrul, Victor ;
Martinelli, Rafael ;
Hamacher, Silvio .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2021, 59 (22) :6833-6847
[3]   The third comprehensive survey on scheduling problems with setup times/costs [J].
Allahverdi, Ali .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2015, 246 (02) :345-378
[4]   Energy optimization of an FPSO operating in the Brazilian Pre-salt region [J].
Allahyarzadeh-Bidgoli, Ali ;
Salviano, Leandro Oliveira ;
Dezan, Daniel Jonas ;
de Oliveira Junior, Silvio ;
Yanagihara, Jurandir Itizo .
ENERGY, 2018, 164 :390-399
[5]  
Barros C., 2010, ASME 2010 29 INT C O
[6]   Planning and scheduling a fleet of rigs using simulation-optimization [J].
Bassi, Hugo Vinicius ;
Martins Ferreira Filho, Virgilio Jose ;
Bahiense, Laura .
COMPUTERS & INDUSTRIAL ENGINEERING, 2012, 63 (04) :1074-1088
[7]  
Beltrao RLC, 2009, OTC-19880-MS
[8]   A single machine scheduling problem with two-dimensional vector packing constraints [J].
Billaut, Jean-Charles ;
Della Croce, Federico ;
Grosso, Andrea .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2015, 243 (01) :75-81
[9]  
Bremenkamp L.H., 2016, 48 S BRAS PESQ OP, P2574
[10]   Speeding up a Rollout algorithm for complex parallel machine scheduling [J].
Ciavotta, Michele ;
Meloni, Carlo ;
Pranzo, Marco .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2016, 54 (16) :4993-5009