Improving crew scheduling by incorporating key maintenance routing decisions

被引:75
作者
Cohn, AM [1 ]
Barnhart, C
机构
[1] Univ Michigan, Ann Arbor, MI 48109 USA
[2] MIT, Cambridge, MA 02139 USA
关键词
D O I
10.1287/opre.51.3.387.14759
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Crew costs are the second-largest operating expense faced by the airline industry, after fuel. Thus, even a small improvement in the quality of a crew schedule can have significant financial impact. Decisions made earlier in the airline planning process, however, can reduce the number of options available to the crew scheduler. We address this limitation by delaying some of these earlier planning decisions-specifically, key maintenance routing decisions-and incorporating them within the crew scheduling problem. We present an extended crew pairing model that integrates crew scheduling and maintenance routing decisions. We prove theoretical results that allow us to improve the tractability of this model by decreasing the number of variables needed and by relaxing the integrality requirement of many of the remaining variables. we discuss how to solve the model both heuristically and to optimality, providing the user with the flexibility to trade off solution time and quality. we present a computational proof-of-concept to support the tractability and effectiveness of our approach.
引用
收藏
页码:387 / 396
页数:10
相关论文
共 24 条
[1]   A GLOBAL APPROACH TO CREW-PAIRING OPTIMIZATION [J].
ANBIL, R ;
TANGA, R ;
JOHNSON, EL .
IBM SYSTEMS JOURNAL, 1992, 31 (01) :71-78
[2]   RECENT ADVANCES IN CREW-PAIRING OPTIMIZATION AT AMERICAN-AIRLINES [J].
ANBIL, R ;
GELMAN, E ;
PATTY, B ;
TANGA, R .
INTERFACES, 1991, 21 (01) :62-74
[3]  
ANBIL R, 1993, OPTIMIZATION IND, P31
[4]   A GRAPH PARTITIONING APPROACH TO AIRLINE CREW SCHEDULING [J].
BALL, M ;
ROBERTS, A .
TRANSPORTATION SCIENCE, 1985, 19 (02) :107-126
[5]   Flight string models for aircraft fleeting and routing [J].
Barnhart, C ;
Boland, NL ;
Clarke, LW ;
Johnson, EL ;
Nemhauser, GL ;
Shenoi, RG .
TRANSPORTATION SCIENCE, 1998, 32 (03) :208-220
[6]   Branch-and-price: Column generation for solving huge integer programs [J].
Barnhart, C ;
Johnson, EL ;
Nemhauser, GL ;
Savelsbergh, MWP ;
Vance, PH .
OPERATIONS RESEARCH, 1998, 46 (03) :316-329
[7]  
Barnhart C, 1997, DESIGN AND OPERATION OF CIVIL AND ENVIRONMENTAL ENGINEERING SYSTEMS, P435
[8]  
Barnhart C., 1999, HDB TRANSPORTATION S, P493
[9]   A tree search algorithm for the crew scheduling problem [J].
Beasley, JE ;
Cao, B .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1996, 94 (03) :517-526
[10]   Solving large scale crew scheduling problems [J].
Chu, HD ;
Gelman, E ;
Johnson, EL .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1997, 97 (02) :260-268