Application of a BP neural network in predicting destroyed floor depth caused by underground pressure

被引:39
作者
Yu, Xiaoge [1 ]
Han, Jin [2 ]
Shi, Longqing [3 ]
Wang, Ying [3 ]
Zhao, Yunping [3 ]
机构
[1] Shandong Univ Sci & Technol, Dept Resource & Civil Engn, Tai An 271019, Shandong, Peoples R China
[2] Shandong Univ Sci & Technol, Coll Comp Sci & Engn, Qingdao 266590, Peoples R China
[3] Shandong Univ Sci & Technol, Coll Earth Sci & Engn, Qingdao 266590, Peoples R China
基金
美国国家科学基金会;
关键词
Destroyed floor depth; Coal mining working face; BP neural network; Prediction; CHINA;
D O I
10.1007/s12665-017-6878-0
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Predicting the destroyed floor depth caused by the mining of coal seams is of great importance in judging whether the mining of a deep coal seam can be safely performed above a confined aquifer and to prevent the inrush of water from the floor. Thirty sets of coal mining data on destroyed floor depth were selected for study. A comprehensive analysis of the factors that influence the depth of destruction of coal seam floor strata was performed and combined with the ability of a BP neural network to address dynamic nonlinear information. Then, a set of test samples was assembled and used to construct a predictive model using a BP neural network. The model was then used to predict the destroyed floor depth of the 7105 working face of the Baizhuang Coal Mine in the Feicheng coal field. To verify the effectiveness of the model, the depth of the destroyed strata comprising the coal seam floor was measured using equipment called the "Double Sided Sealed Borehole Water Injection Device." By comparing the predictions made by the BP neural network with actual measurements, the conclusion was reached that a BP neural network model can effectively be used to predict the destroyed floor depth caused by the mining of a coal seam.
引用
收藏
页数:12
相关论文
共 42 条
[11]  
[弓培林 Gong Peilin], 2005, [岩石力学与工程学报, Chinese Journal of Rock Mechanics and Engineering], V24, P4396
[12]  
[虎维岳 Hu Weiyue], 2010, [煤炭学报, Journal of China Coal Society], V35, P1109
[13]  
[胡耀青 HU Yaoqing], 2008, [岩石力学与工程学报, Chinese Journal of Rock Mechanics and Engineering], V27, P9
[14]  
[姜耀东 JIANG Yaodong], 2011, [岩石力学与工程学报, Chinese Journal of Rock Mechanics and Engineering], V30, P1571
[15]  
[焦李成 Jiao Licheng], 2016, [计算机学报, Chinese Journal of Computers], V39, P1697
[16]  
Khalaf AAM, 2012, EN, V9, P428
[17]  
Li AX, 2007, ELECT SCI TECHNOL, V15, P79
[18]  
Li J., 2015, J CHINA COAL SOC, V40, P303, DOI DOI 10.1007/BF02874524
[19]  
Li JH, 2015, J CHINA COAL SOC S, V40, P1109
[20]  
Liu OG, 2014, COMPUT ENG APPL, V13, P72