Benchmarking preproject planning effort

被引:46
作者
Hamilton, MR [1 ]
Gibson, GE [1 ]
机构
[1] UNIV TEXAS,DEPT CIVIL ENGN,AUSTIN,TX 78712
关键词
D O I
10.1061/(ASCE)0742-597X(1996)12:2(25)
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Benchmarking key performance areas is key to continual improvement of processes. This paper focuses on measurement and benchmarking of the preproject-planning process for capital construction. While experienced members of the construction industry recognize that more effort put into early project planning results in a more successful project, there are few published studies that quantitatively verify this fact. This paper reviews a methodology developed to benchmark the preproject-planning phase to provide a basis for action, follow-up studies, and recalibration of measures and benchmarks. The project that was the object of this study measured the level of preproject-planning effort performed. This level was then related to the ultimate success of the project using data gathered on 62 projects and totaling more than $3.4 billion in authorized cost. Through formal preproject-planning effort, risk is reduced, cost performance can increase by as much as 20%, and schedule performance by as much as 40%.
引用
收藏
页码:25 / 33
页数:9
相关论文
共 8 条
[1]  
Babbie E., 1994, Survey research methods, V2nd
[2]   PREPROJECT-PLANNING PROCESS FOR CAPITAL FACILITIES [J].
GIBSON, GE ;
KACZMAROWSKI, JH ;
LORE, HE .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1995, 121 (03) :312-318
[3]  
GIBSON GE, 1994, 102 U TEX CONSTR IND
[4]  
Hamilton M. R., 1994, 105 U TEX CONSTR IND
[5]  
MITTELSTAEDT RE, 1992, NAT PRODUCTIVITY SUM, P301
[6]  
Spendolini M.J., 1992, BENCHMARKING BOOK
[7]  
*XER CORP, 1988, COMP BENCHM PATH LEA
[8]  
1995, SPECIAL PUBLICATION, V392