Analysis of Ground Settlement Caused by Double-line TBM Tunnelling Under Existing Building

被引:8
|
作者
Hao, Dongxue [1 ]
Zhu, Renjun [2 ]
Wu, Ke [3 ]
Chen, Rong [1 ]
机构
[1] Northeast Elect Power Univ, Sch Civil Engn & Architecture, Jilin 132012, Jilin, Peoples R China
[2] Gongcheng Management Consulting Co Ltd, Huizhou 516003, Peoples R China
[3] Shandong Univ, Sch Civil Engn, Jinan 250061, Peoples R China
基金
中国国家自然科学基金;
关键词
TBM; Crossing building; Numerical simulation; Ground settlement analysis; CONSTRUCTION;
D O I
10.1007/s10706-021-01934-5
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
TBM tunnelling is less used in the subway construction in prosperous city due to the limitation of the engineering geological conditions. The studies on the influence of the TBM construction on the existing buildings are also limited. Therefore, based on the engineering case of tunnel crossing existing building in the section of Haiboqiao similar to Xiaocunzhuang station of Qingdao Metro Line 1, the numerical model that simulates the construction process of TBM tunnelling in slightly weathered granite layer is established by three-dimensional finite difference software FLAC(3D) to analyze the influence of TBM tunnelling. The comparisons between ground deformations obtained by FLAC(3D) and field monitoring data in different construction stages of double-line tunnel have been made firstly to validate the numerical model. Then the ground settlement characteristics, differential settlement and the stress distribution of the existing building and the stress of segment structure have been analyzed. During TBM tunnelling under existing building, the settlement of the building as a whole tends to increase, with the maximum measured settlement of 5.45 mm and the maximum differential settlement of 1.58 mm, which meets the control standard of relevant codes. Ground settlement groove along the transverse and vertical sections occurs near the building and tunnels, and the settlement becomes smaller with the farther the distance from the building and tunnels. The settlement curve on the cross section changes dynamically and is approximately V-shaped, and its width is about 5 similar to 6 times diameter of the tunnel. For the same cross section, the range of the settlement groove after tunnelling right line increases obviously compared with that after tunnelling left line (first construction), the settlement values also increase, and the symmetrical axis of the settlement curve is shifted to the right. For the segment structure, the maximum principal tensile stress occurs inside the arch bottom of the tunnel, while the maximum principal compressive stress occurs near the arch top and arch waist, with obvious stress concentration. For the existing building, the maximum principle tensile stress occurs at the door opening of the wall on the first floor and the maximum principal compressive stress is at the corner of wall. They are less than the tensile strength and compressive strength of the segment structure and building respectively, and have enough safety margins. This paper can provide important practical reference for the deformation control and protection design of surrounding buildings for relative construction.
引用
收藏
页码:899 / 911
页数:13
相关论文
共 50 条
  • [31] Ground vibrations induced by the passage of double-line trains in underground tunnels
    He, Chao
    Zhou, Shunhua
    SOIL DYNAMICS AND EARTHQUAKE ENGINEERING, 2023, 165
  • [32] PREDICTING THE DYNAMICS OF GROUND SETTLEMENT AND ITS DERIVATIVES CAUSED BY TUNNELLING IN SOIL.
    Attewell, P.B.
    Woodman, J.P.
    Ground Engineering, 1982, 15 (08): : 13 - 36
  • [33] Influence of double-line large-slope shield tunneling on settlement of ground surface and mechanical properties of surrounding rock and segment
    Lou, Ping
    Li, Yonghe
    Tang, Xinhui
    Lu, Shide
    Xiao, Hongbo
    Zhang, Zhengang
    ALEXANDRIA ENGINEERING JOURNAL, 2023, 63 : 645 - 659
  • [34] Influence of double-line large-slope shield tunneling on settlement of ground surface and mechanical properties of surrounding rock and segment
    Lou, Ping
    Li, Yonghe
    Tang, Xinhui
    Lu, Shide
    Xiao, Hongbo
    Zhang, Zhengang
    ALEXANDRIA ENGINEERING JOURNAL, 2023, 63 : 645 - 659
  • [35] Prediction of soil settlement induced by double-line shield tunnel based on Peck formula
    Chen Chun-lai
    Zhao Cheng-li
    Wei Gang
    Ding Zhi
    ROCK AND SOIL MECHANICS, 2014, 35 (08) : 2212 - 2218
  • [36] A Variational Approach to Analyze the Settlement of Existing Tunnels Caused by Ground Surcharge
    Chai, Tianjian
    Yan, Jianwei
    Jiang, Xuehui
    Li, Jiabao
    SYMMETRY-BASEL, 2024, 16 (11):
  • [37] Prediction of soil settlement induced by double-line shield tunnel based on Peck formula
    Chen, Chun-Lai
    Zhao, Cheng-Li
    Wei, Gang
    Ding, Zhi
    Yantu Lixue/Rock and Soil Mechanics, 2014, 35 (08): : 2212 - 2218
  • [38] An improvement of FEM analysis in ground settlement prediction in shield tunnelling
    Inokuma, A
    Fujimoto, A
    GEOTECHNICAL ASPECTS OF UNDERGROUND CONSTRUCTION IN SOFT GROUND, 1996, : 537 - 542
  • [39] Analysis of settlement and deformation of subway double line shield beneath existing railway roadbeds
    Yibo Wang
    Discover Applied Sciences, 7 (4)
  • [40] Effect analysis of Double-Line parallel Shield Tunnel crossing frame structure building based on GTS
    Wei, Gang
    Guo, Qigang
    Hong, Jie
    ARCHITECTURE AND BUILDING MATERIALS, PTS 1 AND 2, 2011, 99-100 : 1082 - +