Analysis of Ground Settlement Caused by Double-line TBM Tunnelling Under Existing Building

被引:8
|
作者
Hao, Dongxue [1 ]
Zhu, Renjun [2 ]
Wu, Ke [3 ]
Chen, Rong [1 ]
机构
[1] Northeast Elect Power Univ, Sch Civil Engn & Architecture, Jilin 132012, Jilin, Peoples R China
[2] Gongcheng Management Consulting Co Ltd, Huizhou 516003, Peoples R China
[3] Shandong Univ, Sch Civil Engn, Jinan 250061, Peoples R China
基金
中国国家自然科学基金;
关键词
TBM; Crossing building; Numerical simulation; Ground settlement analysis; CONSTRUCTION;
D O I
10.1007/s10706-021-01934-5
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
TBM tunnelling is less used in the subway construction in prosperous city due to the limitation of the engineering geological conditions. The studies on the influence of the TBM construction on the existing buildings are also limited. Therefore, based on the engineering case of tunnel crossing existing building in the section of Haiboqiao similar to Xiaocunzhuang station of Qingdao Metro Line 1, the numerical model that simulates the construction process of TBM tunnelling in slightly weathered granite layer is established by three-dimensional finite difference software FLAC(3D) to analyze the influence of TBM tunnelling. The comparisons between ground deformations obtained by FLAC(3D) and field monitoring data in different construction stages of double-line tunnel have been made firstly to validate the numerical model. Then the ground settlement characteristics, differential settlement and the stress distribution of the existing building and the stress of segment structure have been analyzed. During TBM tunnelling under existing building, the settlement of the building as a whole tends to increase, with the maximum measured settlement of 5.45 mm and the maximum differential settlement of 1.58 mm, which meets the control standard of relevant codes. Ground settlement groove along the transverse and vertical sections occurs near the building and tunnels, and the settlement becomes smaller with the farther the distance from the building and tunnels. The settlement curve on the cross section changes dynamically and is approximately V-shaped, and its width is about 5 similar to 6 times diameter of the tunnel. For the same cross section, the range of the settlement groove after tunnelling right line increases obviously compared with that after tunnelling left line (first construction), the settlement values also increase, and the symmetrical axis of the settlement curve is shifted to the right. For the segment structure, the maximum principal tensile stress occurs inside the arch bottom of the tunnel, while the maximum principal compressive stress occurs near the arch top and arch waist, with obvious stress concentration. For the existing building, the maximum principle tensile stress occurs at the door opening of the wall on the first floor and the maximum principal compressive stress is at the corner of wall. They are less than the tensile strength and compressive strength of the segment structure and building respectively, and have enough safety margins. This paper can provide important practical reference for the deformation control and protection design of surrounding buildings for relative construction.
引用
收藏
页码:899 / 911
页数:13
相关论文
共 50 条
  • [21] Settlement and Stress Characteristics of the Ground in the Project of a Double-Line Tunnel Undercrossing an Airport Runway in a Sandy Cobble Region
    Zhao, Xuwei
    Li, Jia
    Liu, Wei
    Qiu, Wenge
    APPLIED SCIENCES-BASEL, 2022, 12 (23):
  • [22] Study on the Influence of an Under-Crossing Parallel Double-Line Shield Tunnel on the Existing Tunnel Structure
    Zeng, Linhai
    Zhang, Daobing
    Lian, Changjiang
    Zhang, Jiahua
    Yin, Huadong
    MATHEMATICS, 2023, 11 (14)
  • [23] Characteristics of Ground Surface Settlement of Double-Line Adjacent Metro Construction in Sandy Cobble Stratum: A Case Study of Beijing Airport Line
    Hao, Xianjie
    Sun, Zhuowen
    Zhao, Yixin
    Kang, Yiqiang
    Zhang, Qian
    Cheng, Jinguo
    Wei, Yingnan
    Chen, Zeyu
    KSCE JOURNAL OF CIVIL ENGINEERING, 2021, 25 (11) : 4443 - 4456
  • [24] Analysis of the influence of karst cave parameters on surface settlement in TBM tunnelling
    Dong, Bichang
    Yang, Tao
    Ju, Binbin
    Qu, Zhongying
    Yi, Chao
    BULLETIN OF THE POLISH ACADEMY OF SCIENCES-TECHNICAL SCIENCES, 2024, 72 (04)
  • [25] Characteristics of Ground Surface Settlement of Double-Line Adjacent Metro Construction in Sandy Cobble Stratum: A Case Study of Beijing Airport Line
    Xianjie Hao
    Zhuowen Sun
    Yixin Zhao
    Yiqiang Kang
    Qian Zhang
    Jinguo Cheng
    Yingnan Wei
    Zeyu Chen
    KSCE Journal of Civil Engineering, 2021, 25 : 4443 - 4456
  • [26] Dynamic Response Analysis of Underground Double-Line Tunnel under Surface Blasting
    Zhang, Pei
    Cai, Jianhua
    Zong, Feng
    He, Yanpeng
    Wang, Qiong
    SHOCK AND VIBRATION, 2021, 2021 (2021)
  • [27] Analysis of ground settlement induced by workmanship of shield tunnelling
    Zhu, Cai-Hui
    Li, Ning
    Liu, Hou-Xiang
    Zhang, Zhi-Qiang
    Yantu Lixue/Rock and Soil Mechanics, 2011, 32 (01): : 158 - 164
  • [28] Analysis of ground settlement induced by workmanship of shield tunnelling
    Zhu Cai-hui
    Li Ning
    Liu Hou-xiang
    Zhang Zhi-qiang
    ROCK AND SOIL MECHANICS, 2011, 32 (01) : 158 - 164
  • [29] Analysis of factors influencing surface settlement during shield construction of a double-line tunnel in a mudstone area
    Yuan, Chengwang
    Zhang, Min
    Ji, Shengcai
    Li, Jiwei
    Jin, Lihaolin
    SCIENTIFIC REPORTS, 2022, 12 (01)
  • [30] Analysis of factors influencing surface settlement during shield construction of a double-line tunnel in a mudstone area
    Chengwang Yuan
    Min Zhang
    Shengcai Ji
    Jiwei Li
    Lihaolin Jin
    Scientific Reports, 12