共 108 条
[21]
The practice of time management on construction project
[J].
CIVIL ENGINEERING INNOVATION FOR A SUSTAINABLE,
2015, 125
:32-39
[22]
Pathways to raising disaster risk reduction awareness among the informal construction stakeholders: a case of Nepal
[J].
7TH INTERNATIONAL CONFERENCE ON BUILDING RESILIENCE: USING SCIENTIFIC KNOWLEDGE TO INFORM POLICY AND PRACTICE IN DISASTER RISK REDUCTION,
2018, 212
:784-791
[23]
Creswell J. W., 2003, Research design: Qualitative, quantitative and mixed methods approaches, V2nd
[24]
Cui H., 2018, IOP C SERIES MAT SCI
[25]
Dandage Rahul V., 2018, Journal of Industrial Engineering International, V14, P153, DOI 10.1007/s40092-017-0215-9
[26]
Das P., 2019, REAL ESTATE S ASIA
[30]
Durdyev S., 2018, J. Manag. Econ. Ind. Organ, V2, P51, DOI [10.31039/jomeino.2018.2.2.4, DOI 10.31039/JOMEINO.2018.2.2.4]