Identifying the risk factors in real estate construction projects: an analytical study to propose a control structure for decision-making

被引:13
作者
Deep, Shumank [1 ]
Bhoola, Vanita [2 ]
Verma, Saumya [3 ]
Ranasinghe, Udara [4 ]
机构
[1] Integral Univ, Dept Civil Engn, Lucknow, Uttar Pradesh, India
[2] SP Jain Sch Global Management Mumbai Campus, Mumbai, Maharashtra, India
[3] Giri Inst Dev Studies, Lucknow, Uttar Pradesh, India
[4] Univ Newcastle, Fac Engn & Built Environm, Sch Architecture & Built Environm, Callaghan, NSW, Australia
关键词
Real estate; Risk management; Claims in construction; Project risks; Project management; Real estate construction project; Claims redressal mechanism; Real estate sector; SAFETY PERFORMANCE; ECONOMIC RISK; MANAGEMENT; REDUCTION; MODEL; POWER; TIME;
D O I
10.1108/JFMPC-03-2020-0018
中图分类号
F8 [财政、金融];
学科分类号
0202 ;
摘要
Purpose Construction projects in the real estate sector are important for a nation's economic growth. However, owing to several constraints and stereotypes, the construction industry is suffering from major capital losses. A review of recent literature revealed that risks occurring in real estate construction projects (RECPs) carried out in developing economies can be divided into four categories, i.e. financial risks, design risks, execution risks and sociopolitical risks. This study aims to identify the critical factors that lead to these risk categories and develop a control structure for RECPs. Design/methodology/approach A quantitative method, i.e. a questionnaire-based survey, was used for this study. Using a random sampling technique the questionnaire was distributed to selected, highly experienced project managers. To determine whether the factors identified as part of the literature review strongly influence the categories, the factor analysis of the observations was performed. Findings The observations made in this study lead to the identification of six critical risk causing factors, i.e. lack of efficient planning, execution constraints, external constraints, client-induced constraints, project constraints and partner experience. The observations indicated a lack of knowledge of project management, organizational culture and a claims redressal mechanism in RECPs. Also, this study recommends a blockchain-based control structure to control the occurrence of the risk causing factors identified. Originality/value This study recommends a blockchain-based control structure for controlling the risks occurring.
引用
收藏
页码:220 / 238
页数:19
相关论文
共 108 条
[1]  
Adeleke A.Q., 2019, Int J Supply Chain Manag, V8, P932
[2]  
Akinlana D.M., 2019, CONDITIONAL VOLATILI
[3]  
[Anonymous], 2019, Real Estate Appraisals
[4]  
[Anonymous], 2017, Risk and Financial Management in Construction
[5]   4P delays in project management [J].
Ansah, Richard Hannis ;
Sorooshian, Shahryar .
ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2018, 25 (01) :62-76
[6]   Critical success factors for implementing building information modelling (BIM): A longitudinal review [J].
Antwi-Afari, M. F. ;
Li, H. ;
Parn, E. A. ;
Ewards, D. J. .
AUTOMATION IN CONSTRUCTION, 2018, 91 :100-110
[7]  
Anwar B., 2018, Journal of Developing Areas, V52, P183, DOI [DOI 10.1353/JDA.2018.0012, 10.1353/jda.2018, DOI 10.1353/JDA.2018]
[8]  
Arbuckle, 2010, IBM SPSS AMOS 19 USE, P635, DOI [10.4135/9781526402257.n4, DOI 10.1111/J.1600-0447.2011.01711.X]
[9]  
Arya S., 2019, MAHARERA ATTACHES UN
[10]   POLITICAL RISKS IN INTERNATIONAL CONSTRUCTION [J].
ASHLEY, DB ;
BONNER, JJ .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1987, 113 (03) :447-467