Uncertainty Analysis of Reservoir Operation Based on Stochastic Optimization Approach Using the Generalized Likelihood Uncertainty Estimation Method

被引:13
作者
Muronda, Macdonald Tatenda [1 ]
Marofi, Safar [1 ]
Nozari, Hamed [1 ]
Babamiri, Omid [1 ]
机构
[1] Bu Ali Sina Univ, Dept Water Sci Engn, Hamadan, Hamadan, Iran
关键词
Forecast; Optimal release; PSO; Uncertainty; WEAP; PARTICLE SWARM OPTIMIZATION; SUSTAINABLE ENERGY; WATER ALLOCATION; DAM; INFLOW; DESIGN; MODELS;
D O I
10.1007/s11269-021-02877-5
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This study evaluated the reservoir operation for effective water allocation under uncertainty using linear programming (the water evaluation and planning model: WEAP) and evolutionary optimization (the particle swarm optimization algorithm: PSOA). The stochastic autoregressive integrated moving average (ARIMA) and seasonal autoregressive integrated moving average (SARIMA) models were used to forecast monthly inflow into the AmirKabir dam reservoir (Iran) as well as its net evaporation (2018-2025), respectively. For this purpose, the best-fitted model was selected based on the minimum Akaike criterion and the autocorrelation function (ACF) test. The resulting uncertainty of monthly release for the WEAP and PSOA were analyzed using the generalized likelihood uncertainty estimation method (GLUE). The results showed that the WEAP model proved to be better in meeting water demands during low inflows, whereas the PSOA had a higher certainty in meeting demands during high inflows periods. Also, the WEAP model had a high uncertainty in January-April compared to May-December, whereas the PSO algorithm had a high uncertainty in all months. This evaluation of water allocation considering uncertainties of fluctuating water supply and net evaporation helps us answer questions about optimal allocating of different demand sites: how is water shortage affects economic, social, environmental aspects, and the relationship between systems sustainability and water shortage.
引用
收藏
页码:3179 / 3201
页数:23
相关论文
共 48 条
[21]   Applications of Particle Swarm Optimization in Geotechnical Engineering: A Comprehensive Review [J].
Hajihassani M. ;
Jahed Armaghani D. ;
Kalatehjari R. .
Geotechnical and Geological Engineering, 2018, 36 (02) :705-722
[22]   Estimation of sediment volume in Karaj Dam Reservoir (Iran) by hydrometry method and a comparison with hydrography method [J].
Heidarnejad, Mohammad ;
Golmaee, Said Hassan ;
Mosaedi, Abolfazl ;
Ahmadi, Mirkhalegh Z. .
LAKE AND RESERVOIR MANAGEMENT, 2006, 22 (03) :233-239
[23]   A decade of Predictions in Ungauged Basins (PUB)a review [J].
Hrachowitz, M. ;
Savenije, H. H. G. ;
Bloeschl, G. ;
McDonnell, J. J. ;
Sivapalan, M. ;
Pomeroy, J. W. ;
Arheimer, B. ;
Blume, T. ;
Clark, M. P. ;
Ehret, U. ;
Fenicia, F. ;
Freer, J. E. ;
Gelfan, A. ;
Gupta, H. V. ;
Hughes, D. A. ;
Hut, R. W. ;
Montanari, A. ;
Pande, S. ;
Tetzlaff, D. ;
Troch, P. A. ;
Uhlenbrook, S. ;
Wagener, T. ;
Winsemius, H. C. ;
Woods, R. A. ;
Zehe, E. ;
Cudennec, C. .
HYDROLOGICAL SCIENCES JOURNAL-JOURNAL DES SCIENCES HYDROLOGIQUES, 2013, 58 (06) :1198-1255
[24]   Design optimization of wastewater collection networks by PSO [J].
Izquierdo, Joaquin ;
Montalvo, Idel ;
Perez, Rafael ;
Fuertes, Vicente S. .
COMPUTERS & MATHEMATICS WITH APPLICATIONS, 2008, 56 (03) :777-784
[25]  
Karaboga D., 2005, TR06 ERC U ENG FAC, DOI DOI 10.4236/JSS.2015.36009
[26]  
Kennedy J., 1995, 1995 IEEE International Conference on Neural Networks Proceedings (Cat. No.95CH35828), P1942, DOI 10.1109/ICNN.1995.488968
[27]  
Li HB, 2006, SCALING AND UNCERTAINTY ANALYSIS IN ECOLOGY: METHODS AND APPLICATIONS, P45
[28]  
Machekposhti KH, 2017, CIV ENG J-TEHRAN, V3, P340
[29]   Hydrological forecasting uncertainty assessment: Incoherence of the GLUE methodology [J].
Mantovan, Pietro ;
Todini, Ezio .
JOURNAL OF HYDROLOGY, 2006, 330 (1-2) :368-381
[30]   Adaptive sequentially space-filling metamodeling applied in optimal water quantity allocation at basin scale [J].
Mousavi, S. Jamshid ;
Shourian, M. .
WATER RESOURCES RESEARCH, 2010, 46