Risk assessment of sewage treatment Public Private Partnership projects in China

被引:2
|
作者
Zhao, Hui [1 ]
Zhang, Jingqi [1 ]
Li, Zhijie [1 ]
机构
[1] Qingdao Univ Technol, Sch Management Engn, Qingdao 266520, Peoples R China
关键词
Public Private Partnership; Sewage treatment; Critic method; TOSIS method; Risk assessment; China;
D O I
10.5004/dwt.2022.28108
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
With the deepening of ecological civilization construction, the water pollution caused by the discharge of industrial wastewater and domestic sewage has attracted people's extensive attention. Sewage treatment project is becoming more and more important as an important work of water pollution control. In order to reduce the financial pressure of the government and improve the efficiency of the industry, more and more sewage treatment projects adopt the Public Private Partnership (PPP) financing mode. However, the PPP financing mode of the project has the characteristics of long construction cycle, long investment recovery period, many participants and so on, the project implementation process is faced with more and complex risks, how to effectively carry out the risk management of sewage treatment PPP project is the key to the success of the project. In this paper, the Principal Component Analysis (PCA) is firstly used to reduce the dimension of the risk factor set, and then the risk assessment index system is obtained after further generalization and sorting. On this basis, considering the correlation between the indicators. Use Criteria Importance Though Intercrieria Correlation (CRITIC) objective weighting method to give weight to the indicators. Secondly, the risk assessment model of sewage treatment PPP project is established by using Technique for Order Preference by Similarity to an Ideal Solution (TOPSIS) multi-objective decision-making method. Finally apply the model to the Shanghai city Bailonggang sewage treatment project risk evaluation, the results show that the operation process of sewage disposal PPP projects need to focus on professional talents loss of monitoring and control, construction safety, the effects of government credit risks, and the sensitivity analysis to verify the feasibility and effectiveness of the proposed selection model. It is hoped that the above research can provide useful reference for the construction risk assessment of sewage treatment PPP projects.
引用
收藏
页码:119 / 134
页数:16
相关论文
共 50 条
  • [1] Empirical Study of Risk Assessment and Allocation of Public-Private Partnership Projects in China
    Chan, Albert P. C.
    Yeung, John F. Y.
    Yu, Calvin C. P.
    Wang, Shou Qing
    Ke, Yongjian
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2011, 27 (03) : 136 - 148
  • [2] Risk Misallocation in Public-Private Partnership Projects in China
    Ke, Yongjian
    Wang, Shouqing
    Chan, Albert P. C.
    INTERNATIONAL PUBLIC MANAGEMENT JOURNAL, 2013, 16 (03) : 438 - 460
  • [3] RISK IN PUBLIC - PRIVATE PARTNERSHIP PROJECTS
    Grisakova, Nora
    AKTUALNE PROBLEMY PODNIKOVEJ SFERY 2013, 2013, : 170 - 175
  • [4] Analyzing the effect of public private partnership mode on sewage treatment in China
    Wen, Xin
    Meng, Fange
    Li, Shiheng
    SCIENTIFIC REPORTS, 2024, 14 (01):
  • [5] RISK ASSESSMENT AND MANAGEMENT PUBLIC-PRIVATE PARTNERSHIP PROJECTS IN THE FISHERIES
    Mnatsakanyan, Albert G.
    Ogiy, Oksana G.
    MARINE INTELLECTUAL TECHNOLOGIES, 2018, 3 (04): : 134 - 141
  • [6] Perceived Risk Assessment Criteria for Public-Private Partnership Projects in the Water and Sewage Sector: Comparison of Perspectives from Iranian Public and Private Sectors
    Shahdadi, Leila Moradi
    Aminnejad, Babak
    Sarvari, Hadi
    CIVILENG, 2024, 5 (04): : 1042 - 1056
  • [7] RISK MANAGEMENT PRACTICE IN CHINA'S PUBLIC-PRIVATE PARTNERSHIP PROJECTS
    Ke, Yongjian
    Wang, ShouQing
    Chan, Albert P. C.
    JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2012, 18 (05) : 675 - 684
  • [8] Discounting for public-private partnership projects in China
    Luo, Lanlan
    Zou, Ziran
    Chen, Shou
    ECONOMIC MODELLING, 2021, 98 : 218 - 226
  • [9] Risk Factors in IT Public-Private Partnership Projects
    Ghribi, Souhir
    Hudon, Pierre-Andre
    Mazouz, Bachir
    PUBLIC WORKS MANAGEMENT & POLICY, 2019, 24 (04) : 321 - 343
  • [10] Risk Ranking of Malaysian Public Private Partnership Projects
    Sarvari, Hadi
    Valipuor, Alireza
    Yahaya, Nordin
    Noor, Norhazilan Md
    STRUCTURAL, ENVIRONMENTAL, COASTAL AND OFFSHORE ENGINEERING, 2014, 567 : 613 - 618