The blocking flow shop scheduling problem: A comprehensive and conceptual review

被引:49
作者
Miyata, Hugo Hissashi [1 ]
Nagano, Marcelo Seido [1 ]
机构
[1] Univ Sao Paulo, Sao Carlos Sch Engn, Prod Engn Dept, Av Trabalhador Sao Carlense 400, BR-13566590 Sao Carlos, SP, Brazil
关键词
Scheduling; Blocking flow shop; Solution methods; Literature review; Classification; BEE COLONY ALGORITHM; PARTICLE SWARM OPTIMIZATION; DIFFERENTIAL EVOLUTION ALGORITHM; NEIGHBORHOOD SEARCH ALGORITHM; TOTAL TARDINESS MINIMIZATION; BATCH-PROCESSING MACHINES; ITERATED GREEDY ALGORITHM; HYBRID GENETIC ALGORITHM; TOTAL COMPLETION-TIME; DE-BASED ALGORITHM;
D O I
10.1016/j.eswa.2019.06.069
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
This paper presents a literature review on the m-machine flow shop scheduling problem with blocking conditions. In total, 139 papers are reviewed and classified, ranging from 1969 up to early 2019. Results showed that makespan was the objective function most adopted by the researchers, with 62% of the total covered, followed by multi-objective based (12%), total flow time-based (11%), due date-based (7%), stochastic based functions (6%) and cycle time (3%). Regarding the purpose of the paper, approximately 92% of the papers proposed solution methods, where 76% of the papers developed heuristic methods and 16% of exact methods, and 8% of the papers considered the analysis of the problem and literature reviews. Directions for future researches include the proposition of solution methods for mono-objective functions as total flow time-based and due date-based, development of solution methods for the m-machine flow shop with RCb and RCb* constraints and adoption of more than one additional constraint to the problem. (C) 2019 Elsevier Ltd. All rights reserved.
引用
收藏
页码:130 / 156
页数:27
相关论文
共 195 条
  • [1] A new algorithm for minimizing makespan, Cmax, in blocking flow-shop problem through slowing down the operations
    Abadi, I. N. Kamal
    [J]. JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2007, 58 (01) : 134 - 140
  • [2] Minimizing cycle time in a blocking flowshop
    Abadi, INK
    Hall, NG
    Sriskandarajah, C
    [J]. OPERATIONS RESEARCH, 2000, 48 (01) : 177 - 180
  • [3] THROUGHPUT OPTIMIZATION FOR THE ROBOTIC CELL PROBLEM WITH CONTROLLABLE PROCESSING TIMES
    Al-Salem, Mohammed
    Kharbeche, Mohamed
    [J]. RAIRO-OPERATIONS RESEARCH, 2017, 51 (03) : 805 - 818
  • [4] The Non-Permutation Flow-Shop scheduling problem: A literature review
    Alejandro Rossit, Daniel
    Tohme, Fernando
    Frutos, Mariano
    [J]. OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2018, 77 : 143 - 153
  • [5] A survey of scheduling problems with setup times or costs
    Allahverdi, Ali
    Ng, C. T.
    Cheng, T. C. E.
    Kovalyov, Mikhail Y.
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 187 (03) : 985 - 1032
  • [6] The third comprehensive survey on scheduling problems with setup times/costs
    Allahverdi, Ali
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2015, 246 (02) : 345 - 378
  • [7] [Anonymous], 10 C SOC FRANC RECH
  • [8] [Anonymous], ORDONNANCEMENT DE SY
  • [9] [Anonymous], 2018, INT J OPER QUANT MAN
  • [10] [Anonymous], SPREA2