An evaluation of the applicability of 4D CAD on construction projects

被引:93
|
作者
Mahalingam, Ashwin [1 ]
Kashyap, Rahul [2 ]
Mahajan, Charudatta [3 ]
机构
[1] Indian Inst Technol Madras, Madras 600036, Tamil Nadu, India
[2] Cushman & Wakefield India Pvt Ltd, Dev Projects, Madras, Tamil Nadu, India
[3] Larsen & Toubro, ECC, Bombay, Maharashtra, India
关键词
4D CAD; Commercial projects; Infrastructure projects; Benefits; Visualization; Constructability; Project progress review;
D O I
10.1016/j.autcon.2009.11.015
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
4D CAD models that integrate physical 3D elements with time, have been used to visualize construction processes in several projects worldwide. 4D models have been used and have been shown to have benefits over processes that span the entire lifecycle of a project such as collaboration with stakeholders, making design decisions, assessing project constructability, identifying spatial conflicts in construction and so on. Despite these benefits, several organizational and project-specific barriers have hindered the widespread adoption of 4D CAD. In order to reconcile the theoretical benefits of 4D models with the practical difficulties faced in implementation, there is an urgent need to explore the implementation of 4D models on construction sites as well as the perceptions of intended users/beneficiaries towards this implementation. This paper aims to address this need and contribute to our understanding of how 4D models must be introduced, positioned and implemented on construction sites, so as to maximize both their acceptability and their usefulness. We describe two 4D models of infrastructure projects and two 4D models of commercial projects that have been built and implemented. Through a process of structured and unstructured interviewing the paper gauges the response of project participants across various organizational levels on each of these projects as to the usefulness of 4D in project planning and control. Through qualitative and statistical analysis of the data we establish that 4D CAD is likely to be most beneficial in the project shaping or planning stage and in the construction stage. In the project shaping stage, 4D CAD is likely to be particularly useful in communicating construction plans and processes to clients, while during the construction phase, 4D CAD is likely to be particularly useful in comparing the constructability of work methods visually in order to detect conflicts or clashes, and as a visual tool for contractors, clients, subcontractors and vendors to review and plan project progress. Further, upper management and site workers are more likely to use and derive benefits from the visualization of processes using 4D given their lack of site related knowledge or skills, while construction professionals who are more construction-savvy are more likely to appreciate and benefit from the analytical and planning aids that 4D simulations provide during the construction phase. However, it is likely that despite these benefits 4D CAD models might not diffuse through the construction industry unless 4D modelling and analysis is integrated into existing project planning approaches. The paper concludes with a brief discussion on future 4D software development that seeks to bring about such integration and leverages the benefits of 4D CAD to bring about improved operational efficiencies on construction sites. (C) 2009 Elsevier B.V. All rights reserved.
引用
收藏
页码:148 / 159
页数:12
相关论文
共 50 条
  • [41] Linear scheduling and 4D visualization
    Staub-French, Sheryl
    Russel, Alan
    Tran, Ngoc
    JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2008, 22 (03) : 192 - 205
  • [42] Benefit Evaluation of Design for Excellence in Industrialized Construction Projects
    Wuni, Ibrahim Yahaya
    Wu, Zezhou
    Shen, Geoffrey Qiping
    Bugri, John Tiah
    Frimpong-Asante, James
    JOURNAL OF ARCHITECTURAL ENGINEERING, 2021, 27 (04)
  • [43] Improvement of Realism of 4D Objects Using Augmented Reality Objects and Actual Images of a Construction Site
    Kim, Hyeon Seung
    Kim, Sung-Keun
    Borrmann, Andre
    Kang, Leen Seok
    KSCE JOURNAL OF CIVIL ENGINEERING, 2018, 22 (08) : 2735 - 2746
  • [44] Improvement of Realism of 4D Objects Using Augmented Reality Objects and Actual Images of a Construction Site
    Hyeon Seung Kim
    Sung-Keun Kim
    Andre Borrmann
    Leen Seok Kang
    KSCE Journal of Civil Engineering, 2018, 22 : 2735 - 2746
  • [45] 4D BIM for Environmental Planning and Management
    Jupp, Julie
    INTERNATIONAL HIGH-PERFORMANCE BUILT ENVIRONMENT CONFERENCE - A SUSTAINABLE BUILT ENVIRONMENT CONFERENCE 2016 SERIES (SBE16), IHBE 2016, 2017, 180 : 190 - 201
  • [46] 4D Models in World Wide Web
    Hejmanowska, Beata
    Mikrut, Slawomir
    Strus, Agnieszka
    Glowienka, Ewa
    Michalowska, Krystyna
    2018 BALTIC GEODETIC CONGRESS (BGC-GEOMATICS 2018), 2018, : 1 - 6
  • [47] 4D Reconstruction and Visualisation of Krakow Fortress
    Glowienka, Ewa
    Michalowska, Krystyna
    Hejmanowska, Beata
    Mikrut, Slawomir
    Kramarczyk, Piotr
    Strus, Agnieszka
    Opalinski, Piotr
    2017 BALTIC GEODETIC CONGRESS (BGC GEOMATICS), 2017, : 1 - 5
  • [48] 4D Electron Microscopy: Principles and Applications
    Flannigan, David J.
    Zewail, Ahmed H.
    ACCOUNTS OF CHEMICAL RESEARCH, 2012, 45 (10) : 1828 - 1839
  • [49] 4D BEYOND CONSTRUCTION: SPATIO-TEMPORAL AND LIFE-CYCLIC MODELING AND VISUALIZATION OF INFRASTRUCTURE DATA
    Zhang, Zixiao
    Hamledari, Hesam
    Billington, Sarah
    Fischer, Martin
    JOURNAL OF INFORMATION TECHNOLOGY IN CONSTRUCTION, 2018, 23 : 285 - 304
  • [50] Evaluation of real-time guidewire navigation using virtual endoscopic 4D fluoroscopy
    Davis, Brian J.
    Wagner, Martin G.
    Periyasamy, Sarvesh
    Mistretta, Charles A.
    Strother, Charles M.
    Laeseke, Paul F.
    Speidel, Michael A.
    MEDICAL IMAGING 2020: IMAGE-GUIDED PROCEDURES, ROBOTIC INTERVENTIONS, AND MODELING, 2021, 11315