An evaluation of the applicability of 4D CAD on construction projects

被引:93
|
作者
Mahalingam, Ashwin [1 ]
Kashyap, Rahul [2 ]
Mahajan, Charudatta [3 ]
机构
[1] Indian Inst Technol Madras, Madras 600036, Tamil Nadu, India
[2] Cushman & Wakefield India Pvt Ltd, Dev Projects, Madras, Tamil Nadu, India
[3] Larsen & Toubro, ECC, Bombay, Maharashtra, India
关键词
4D CAD; Commercial projects; Infrastructure projects; Benefits; Visualization; Constructability; Project progress review;
D O I
10.1016/j.autcon.2009.11.015
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
4D CAD models that integrate physical 3D elements with time, have been used to visualize construction processes in several projects worldwide. 4D models have been used and have been shown to have benefits over processes that span the entire lifecycle of a project such as collaboration with stakeholders, making design decisions, assessing project constructability, identifying spatial conflicts in construction and so on. Despite these benefits, several organizational and project-specific barriers have hindered the widespread adoption of 4D CAD. In order to reconcile the theoretical benefits of 4D models with the practical difficulties faced in implementation, there is an urgent need to explore the implementation of 4D models on construction sites as well as the perceptions of intended users/beneficiaries towards this implementation. This paper aims to address this need and contribute to our understanding of how 4D models must be introduced, positioned and implemented on construction sites, so as to maximize both their acceptability and their usefulness. We describe two 4D models of infrastructure projects and two 4D models of commercial projects that have been built and implemented. Through a process of structured and unstructured interviewing the paper gauges the response of project participants across various organizational levels on each of these projects as to the usefulness of 4D in project planning and control. Through qualitative and statistical analysis of the data we establish that 4D CAD is likely to be most beneficial in the project shaping or planning stage and in the construction stage. In the project shaping stage, 4D CAD is likely to be particularly useful in communicating construction plans and processes to clients, while during the construction phase, 4D CAD is likely to be particularly useful in comparing the constructability of work methods visually in order to detect conflicts or clashes, and as a visual tool for contractors, clients, subcontractors and vendors to review and plan project progress. Further, upper management and site workers are more likely to use and derive benefits from the visualization of processes using 4D given their lack of site related knowledge or skills, while construction professionals who are more construction-savvy are more likely to appreciate and benefit from the analytical and planning aids that 4D simulations provide during the construction phase. However, it is likely that despite these benefits 4D CAD models might not diffuse through the construction industry unless 4D modelling and analysis is integrated into existing project planning approaches. The paper concludes with a brief discussion on future 4D software development that seeks to bring about such integration and leverages the benefits of 4D CAD to bring about improved operational efficiencies on construction sites. (C) 2009 Elsevier B.V. All rights reserved.
引用
收藏
页码:148 / 159
页数:12
相关论文
共 50 条
  • [21] THE 4D CAD MODEL WITH FALL GUARD BOUNDARY VISUALIZATION
    Benjaoran, Vacharapoom
    Bhokha, Sdhabhon
    SURANAREE JOURNAL OF SCIENCE AND TECHNOLOGY, 2009, 16 (03): : 193 - 203
  • [22] AN INTERACTIVE APPROACH TO COLLABORATIVE 4D CONSTRUCTION PLANNING
    Zhou, Wei
    Heesom, David
    Georgakis, Panagiotis
    Nwagboso, Christopher
    Feng, Adam
    JOURNAL OF INFORMATION TECHNOLOGY IN CONSTRUCTION, 2009, 14 : 30 - 47
  • [23] 4D Simulation Research in Construction: A Systematic Mapping Study
    Boton, Conrad
    Rivest, Louis
    Kubicki, Sylvain
    Ghnaya, Oussama
    ARCHIVES OF COMPUTATIONAL METHODS IN ENGINEERING, 2023, 30 (04) : 2451 - 2472
  • [24] Critical evaluation of reverse engineering tool Imagix 4D!
    Yadav, Rashmi
    Patel, Ravindra
    Kothari, Abhay
    SPRINGERPLUS, 2016, 5
  • [25] Evaluation of intracranial stenoses and aneurysms with accelerated 4D flow
    Hope, Thomas A.
    Hope, Michael D.
    Purell, Derk D.
    von Morze, Cornelius
    Vigneron, Daniel B.
    Alley, Marcus T.
    Dillon, William P.
    MAGNETIC RESONANCE IMAGING, 2010, 28 (01) : 41 - 46
  • [26] 4D dynamic construction management and visualization software: 1. Development
    Chau, KW
    Anson, M
    Zhang, JP
    AUTOMATION IN CONSTRUCTION, 2005, 14 (04) : 512 - 524
  • [27] Interior construction state recognition with 4D BIM registered image sequences
    Kropp, Christopher
    Koch, Christian
    Koenig, Markus
    AUTOMATION IN CONSTRUCTION, 2018, 86 : 11 - 32
  • [28] Dynamic quantification and analysis of the construction workspace congestion utilising 4D visualisation
    Mallasi, Zaki
    AUTOMATION IN CONSTRUCTION, 2006, 15 (05) : 640 - 655
  • [29] A 4D automatic simulation tool for construction resource planning: a case study
    Li, Heng
    Chan, Greg
    Skitmore, Martin
    Huang, Ting
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2015, 22 (05) : 536 - 550
  • [30] Strategies for representation and analyses of 4D modeling applied to construction project management
    Brito, Douglas M.
    Ferreira, Emerson A. M.
    8TH NORDIC CONFERENCE ON CONSTRUCTION ECONOMICS AND ORGANIZATION, 2015, 21 : 374 - 382