An evaluation of the applicability of 4D CAD on construction projects

被引:93
|
作者
Mahalingam, Ashwin [1 ]
Kashyap, Rahul [2 ]
Mahajan, Charudatta [3 ]
机构
[1] Indian Inst Technol Madras, Madras 600036, Tamil Nadu, India
[2] Cushman & Wakefield India Pvt Ltd, Dev Projects, Madras, Tamil Nadu, India
[3] Larsen & Toubro, ECC, Bombay, Maharashtra, India
关键词
4D CAD; Commercial projects; Infrastructure projects; Benefits; Visualization; Constructability; Project progress review;
D O I
10.1016/j.autcon.2009.11.015
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
4D CAD models that integrate physical 3D elements with time, have been used to visualize construction processes in several projects worldwide. 4D models have been used and have been shown to have benefits over processes that span the entire lifecycle of a project such as collaboration with stakeholders, making design decisions, assessing project constructability, identifying spatial conflicts in construction and so on. Despite these benefits, several organizational and project-specific barriers have hindered the widespread adoption of 4D CAD. In order to reconcile the theoretical benefits of 4D models with the practical difficulties faced in implementation, there is an urgent need to explore the implementation of 4D models on construction sites as well as the perceptions of intended users/beneficiaries towards this implementation. This paper aims to address this need and contribute to our understanding of how 4D models must be introduced, positioned and implemented on construction sites, so as to maximize both their acceptability and their usefulness. We describe two 4D models of infrastructure projects and two 4D models of commercial projects that have been built and implemented. Through a process of structured and unstructured interviewing the paper gauges the response of project participants across various organizational levels on each of these projects as to the usefulness of 4D in project planning and control. Through qualitative and statistical analysis of the data we establish that 4D CAD is likely to be most beneficial in the project shaping or planning stage and in the construction stage. In the project shaping stage, 4D CAD is likely to be particularly useful in communicating construction plans and processes to clients, while during the construction phase, 4D CAD is likely to be particularly useful in comparing the constructability of work methods visually in order to detect conflicts or clashes, and as a visual tool for contractors, clients, subcontractors and vendors to review and plan project progress. Further, upper management and site workers are more likely to use and derive benefits from the visualization of processes using 4D given their lack of site related knowledge or skills, while construction professionals who are more construction-savvy are more likely to appreciate and benefit from the analytical and planning aids that 4D simulations provide during the construction phase. However, it is likely that despite these benefits 4D CAD models might not diffuse through the construction industry unless 4D modelling and analysis is integrated into existing project planning approaches. The paper concludes with a brief discussion on future 4D software development that seeks to bring about such integration and leverages the benefits of 4D CAD to bring about improved operational efficiencies on construction sites. (C) 2009 Elsevier B.V. All rights reserved.
引用
收藏
页码:148 / 159
页数:12
相关论文
共 50 条
  • [1] Applicability of 4D CAD in Civil Engineering Construction: Case Study of a Cable-Stayed Bridge Project
    Kim, Changyoon
    Kim, Hyoungkwan
    Park, Taekwun
    Kim, Moon Kyum
    JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2011, 25 (01) : 98 - 107
  • [2] 4D visualization of highway construction projects
    Liapi, KA
    SEVENTH INTERNATIONAL CONFERENCE ON INFORMATION VISUALIZATION, PROCEEDINGS, 2003, : 639 - 644
  • [3] 3D/4D CAD Applicability for Life-Cycle Facility Management
    Park, Jungjun
    Kim, Byungil
    Kim, Changyoon
    Kim, Hyoungkwan
    JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2011, 25 (02) : 129 - 138
  • [4] Using 4D CAD to visualize the impacts of highway construction on the public
    Zanen, P. P. A.
    Hartmann, T.
    Al-Jibouri, S. H. S.
    Heijmans, H. W. N.
    AUTOMATION IN CONSTRUCTION, 2013, 32 : 136 - 144
  • [5] 4D CAD Based Method for Supporting Coordination of Urban Subsurface Utility Projects
    Scholtenhuis, Leon L. Olde
    Hartmann, Timo
    Doree, Andre G.
    AUTOMATION IN CONSTRUCTION, 2016, 62 : 66 - 77
  • [6] 4D CAD models to support the coordination of construction activities between contractors
    Trebbe, Martijn
    Hartmann, Timo
    Doree, Andre
    AUTOMATION IN CONSTRUCTION, 2015, 49 : 83 - 91
  • [7] 4D CAD Application Examples and Directions for Development in Civil Engineering Projects
    Kwak, Joong-Min
    Choi, Gwang-Yeol
    Park, Nam-Jin
    Seo, Hwa-Jin
    Kang, Leen-Seok
    EDUCATION AND MANAGEMENT TECHNOLOGY, ICEMT 2011, 2011, 13 : 163 - 167
  • [8] Construction Management Utilizing 4D CAD and Operations Simulation Methodologies
    张建平
    张洋
    胡振中
    鹿明
    Tsinghua Science and Technology, 2008, (S1) : 241 - 247
  • [9] Construction Management Utilizing 4D CAD and Operations Simulation Methodologies
    Zhang, Jianping
    Zhang, Yang
    Hu, Zhenzhong
    Lu, Ming
    Tsinghua Science and Technology, 2008, 13 (SUPPL. 1): : 241 - 247
  • [10] Application of 4D for dynamic site layout and management of construction projects
    Ma, ZY
    Shen, QP
    Zhang, JP
    AUTOMATION IN CONSTRUCTION, 2005, 14 (03) : 369 - 381