Administrative risks challenging the adoption of smart contracts in construction projects

被引:33
作者
Gurgun, Asli Pelin [1 ]
Koc, Kerim [1 ]
机构
[1] Yildiz Tech Univ, Civil Engn, Istanbul, Turkey
关键词
Smart contracts; Automated construction process; Administrative risks; Construction contracts; Fuzzy AHP; CRITICAL SUCCESS FACTORS; FUZZY-AHP; BUILT ENVIRONMENT; HIERARCHY PROCESS; MANAGEMENT; BLOCKCHAIN; BARRIERS; DECISION; INDUSTRY; MODEL;
D O I
10.1108/ECAM-09-2020-0678
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Purpose As a remedy to usually voluminous, complicated and not easily readable construction contracts, smart contracts can be considered as an effective and alternative solution. However, the construction industry is merely known as a frontrunner for fast adoption of recent technological advancements. Numerous administrative risks challenge construction companies to implement smart contracts. To highlight this issue, this study aims to assess the administrative risks of smart contract adoption in construction projects. Design/methodology/approach A literature survey is conducted to specify administrative risks of smart contracts followed by a pilot study to ensure that the framework is suitable to the research question. The criteria weights are calculated through the fuzzy analytical hierarchy process method, followed by a sensitivity analysis based on degree of fuzziness, which supports the robustness of the developed hierarchy and stability of the results. Then, a focus group discussion (FGD) is performed to discuss the mitigation strategies for the top-level risks in each risk category. Findings The final framework consists of 27 sub-criteria, which are categorized under five main criteria, namely, contractual, cultural, managerial, planning and relational. The findings show that (1) regulation change, (2) lack of a driving force, (3) works not accounted in planning, (4) shortcomings of current legal arrangements and (5) lack of dispute resolution mechanism are the top five risks challenging the adoption of smart contracts in construction projects. Risk mitigation strategies based on FGD show that improvements for the semi-automated smart contract drafting are considered more practicable compared to full automation. Originality/value The literature is limited in terms of the adoption of smart contracts, while the topic is receiving more attention recently. To support easy prevalence of smart contracts, this study attempts the most challenging aspects of smart contract adoption.
引用
收藏
页码:989 / 1015
页数:27
相关论文
共 132 条
[71]   Blockchain in the built environment and construction industry: A systematic review, conceptual models and practical use cases [J].
Li, Jennifer ;
Greenwood, David ;
Kassem, Mohamad .
AUTOMATION IN CONSTRUCTION, 2019, 102 :288-307
[72]   Critical Project Management Factors of AEC Firms for Delivering Green Building Projects in Singapore [J].
Li, Yuan Yuan ;
Chen, Po-Han ;
Chew, David Ah Seng ;
Teo, Chee Chong ;
Ding, Rong Gui .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2011, 137 (12) :1153-1163
[73]   Joint-Venture Contractor Selection Using Competitive and Collaborative Criteria with Uncertainty [J].
Liang, Ru ;
Zhang, Jinwen ;
Wu, Changzhi ;
Sheng, Zhaohan ;
Wang, Xiangyu .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2019, 145 (02)
[74]  
Lindlof T., 2011, QUALITATIVE COMMUNIC
[75]   Effect of adoption of relational contracting practices on relationship quality in public projects in Singapore [J].
Ling, Florence Y. Y. ;
Tan, Peng Chong ;
Ning, Yan ;
Teo, Albert ;
Gunawansa, Asanga .
ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2015, 22 (02) :169-189
[76]   Understanding effects of BIM on collaborative design and construction: An empirical study in China [J].
Liu, Yan ;
Van Nederveen, Sander ;
Hertogh, Marcel .
INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2017, 35 (04) :686-698
[77]   Causal Discovery and Inference of Project Disputes [J].
Love, Peter E. D. ;
Davis, Peter Rex ;
Cheung, Sai On ;
Irani, Zahir .
IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 2011, 58 (03) :400-411
[78]  
Luo H., 2019, P 36 INT S AUT ROB C, V36, P1254, DOI [DOI 10.22260/ISARC2019/0170, DOI 10.22260/ISARC2019/0168]
[79]   Supply Chain Management for Prefabricated Building Projects in Hong Kong [J].
Luo, Lizi ;
Jin, Xin ;
Shen, Geoffrey Qiping ;
Wang, Yingjie ;
Liang, Xin ;
Li, Xiao ;
Li, Clyde Zhengdao .
JOURNAL OF MANAGEMENT IN ENGINEERING, 2020, 36 (02)
[80]   Analyzing driving factors of land values in urban scale based on big data and non-linear machine learning techniques [J].
Ma, Jun ;
Cheng, Jack C. P. ;
Jiang, Feifeng ;
Chen, Weiwei ;
Zhang, Jingcheng .
LAND USE POLICY, 2020, 94