Irrigation performance before and after rehabilitation of a representative, small irrigation scheme besides the Senegal River, Mauritania

被引:24
|
作者
Mateos, Luciano [1 ]
Lozano, David [1 ]
Baghil, Ahmed Baba Ouid [2 ]
Diallo, Oumar Abdoul [3 ,4 ]
Gomez-Macpherson, Helena [1 ]
Comas, Jordi [5 ]
Connor, David [6 ]
机构
[1] CSIC, Inst Agr Sostenible, Cordoba 14005, Spain
[2] Inst Supe Enseignement Technol Rosso, Nouakchott, Mauritania
[3] Ctr Natl Rech Agron & Dev Agr, Kaedi, Mauritania
[4] Fdn Politecn Cataluna, Kaedi, Mauritania
[5] Univ Politecn Cataluna, E-08028 Barcelona, Spain
[6] Univ Melbourne, Melbourne Sch Land & Environm, Melbourne, Vic 3010, Australia
关键词
Irrigation system management; Irrigation system maintenance; Irrigation requirements; Rehabilitation; WATER MANAGEMENT; OFFICE; SYSTEM; PRODUCTIVITY; DELIVERY; FARMERS;
D O I
10.1016/j.agwat.2010.01.021
中图分类号
S3 [农学(农艺学)];
学科分类号
0901 ;
摘要
During the last quarter of the 20th century, many irrigation schemes were constructed along the bank of the Senegal River in Mauritania. About 40,000 ha were developed but less than 23,000 ha remain irrigated today. A program for rehabilitation is now in place to counteract deterioration and abandonment of these schemes. This paper presents an evaluation of the rehabilitation of a small, representative irrigation scheme governed by a farmers' cooperative in the village of Belinabe. Before rehabilitation, the scheme covered 37.7 ha comprising 107 plots each of 0.33 ha, essentially all devoted to production of rice. Water for irrigation was pumped directly from the river into two head basins and distributed through open canals. After rehabilitation, the scheme was extended to 115 ha with new plots averaging 0.36 ha. Water is now supplied by a single cluster of pumps and conveyed through pipes and open canals. Evaluation of performance consisted in analysis of: capacity; distribution losses; flexibility, adequacy and reliability of the system; maintenance status; farmer's perception of system performance. Field data were collected during irrigation campaigns before rehabilitation in 2004 and during 2006 and 2007 afterwards. A model of network distribution and field water balance was developed to assist evaluation. It was established that before rehabilitation the scheme could operate satisfactorily if proper maintenance were practiced. After rehabilitation, more families have access to irrigation but reliability and flexibility of water distribution have been reduced. Furthermore, pumping capacity is now insufficient to cover crop water requirements. Recommendations are provided for future rehabilitation work and maintenance of schemes generally. (C) 2010 Elsevier B.V. All rights reserved.
引用
收藏
页码:901 / 909
页数:9
相关论文
共 25 条
  • [21] Evaluation of hydraulic performance on Lower Areb small-scale irrigation scheme Amhara, Ethiopia
    Gashaw Sintayehu
    Alemshet Belayneh
    Kibrit Gedam
    Tirunesh Muluken
    Kefale Munye
    Chalachew Mulat
    Dawit Munye
    Sustainable Water Resources Management, 2022, 8
  • [22] Performance Evaluation of Ethana Small-Scale Irrigation Scheme: Wolaita Zone, Southern Ethiopia
    Chala, Mandefro
    Akamo, Alemitu
    AIR SOIL AND WATER RESEARCH, 2024, 17
  • [23] Remote Sensing Monitoring of Spatial-Temporal Variation of Soil Salinization before and after Irrigation in the Yellow River Delta
    Sun, Huizhong
    Xu, Lirong
    Wang, Jun
    Fu, Xin
    JOURNAL OF COASTAL RESEARCH, 2020, : 56 - 60
  • [24] Evaluating performance and yield stability of some groundnut (Arachis hypogaea L) varieties under irrigation in three agroecological zones of the Senegal River Valley
    Cisse, Madiama
    Diallo, Souleymane
    ADVANCES IN INTEGRATED SOIL FERTILITY MANAGEMENT IN SUB-SAHARAN AFRICA: CHALLENGES AND OPPORTUNITIES, 2007, : 713 - 721
  • [25] Analysis of the social and physical factors affecting irrigation scheme performance: The case of the Omo Gibe river basin in the Southern Nations, Nationalities and Peoples' Region, Ethiopia
    Belayneh, Moltot Zewdie
    IRRIGATION AND DRAINAGE, 2024, 73 (04) : 1548 - 1557