Utilization of processing time windows to enhance planning and scheduling in short tem multipurpose batch plants

被引:5
作者
Rodrigues, LA
Graells, M
Cantón, J
Gimeno, L
Rodrigues, MTM
Espuña, A
Puigjaner, L
机构
[1] Univ Estadual Campinas, FEEC, Sch Elect & Comp Engn, BR-13083970 Campinas, SP, Brazil
[2] Univ Politecn Catalunya, Dept Chem Engn, ETSEIB, E-08028 Barcelona, Spain
[3] Univ Estadual Campinas, FEQ, Sch Chem Engn, BR-13083970 Campinas, SP, Brazil
关键词
time windows; multipurpose batch plants; simulated annealing;
D O I
10.1016/S0098-1354(00)00472-5
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
The problem considered is short term scheduling in multipurpose batch plants when the main objective is adherence to due dates. The solution approach contemplates a two-phase procedure. The planning phase consists of processing time-windows for all the necessary batches to meet the products' demand. This information is extensively uses in the scheduling phase. Three approaches are considered in the last phase, a MILP formulation using uniform discrete time representation; constrained based search (CBS) and simulated annealing (SA), And assessment is made of these techniques in heavily constrained problems and how these approaches deal with equipment units sharing and constraints imposed by material balances and storage conditions. The advantages of the two-phase approach are shown in each case with illustrative examples. (C) 2000 Elsevier Science Ltd. All rights reserved.
引用
收藏
页码:353 / 359
页数:7
相关论文
共 6 条
[1]  
GRAELLS M, 1996, 2 INT C COMP INT MAN, P456
[2]  
*ILOG, 1997, ILOG SCH 4 0 US MAN
[3]  
Keng N. P., 1988, EXPERT SYSTEMS INTEL, P57
[4]   A GENERAL ALGORITHM FOR SHORT-TERM SCHEDULING OF BATCH-OPERATIONS .1. MILP FORMULATION [J].
KONDILI, E ;
PANTELIDES, CC ;
SARGENT, RWH .
COMPUTERS & CHEMICAL ENGINEERING, 1993, 17 (02) :211-227
[5]  
PAPAGEORGIOU LG, 1993, COMPUT CHEM ENG, V17, P27
[6]  
SADEH N, 1991, THESIS CARNEGIE MELL