Costs and performance of advanced zero emission systems of IGCC with CCS in Japan

被引:3
|
作者
Tokimatsu, Koji [1 ]
Tsuboi, Shigeki [1 ]
Iritani, Junichi [1 ]
Onozaki, Masaki [1 ]
机构
[1] Inst Appl Energy, Minato Ku, Tokyo 1050003, Japan
来源
GHGT-11 | 2013年 / 37卷
关键词
oxygen-blown IGCC with CCS systems; CCS; CO2; transportation;
D O I
10.1016/j.egypro.2013.06.134
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
This paper provides processes and results of economic evaluation of advanced zero emission systems of Integrated Gasification of Combined Cycle (IGCC) with Carbon Capture, transport and Storage (CCS). The project named FS was funded by New Energy and Industrial Technology Development Organization (NJ/DO). The IGCC+CCS system has following three characteristics. (1) Net output is 300 MIVe, relatively small in comparison to other commercialized pulverized coal combustion power plants. (2) Assessment of transportation and storage is rich in technologies as well as site-specific characteristics for various transportation patterns using ships and pipelines (EL) between sources and sinks. And (3) The system is designed for a post- demonstration plant in the brown field expected to be constructed in the beginning of 2020s, hence as a result, its economic evaluation should be considered as "first of a kind"(FOAK). Six transportation cases were investigated, as the majority of the plants are located along the coast of Japan. Cost evaluation for storage was based on the preceding studies in Japan where an emphasis was placed on IGCC with detailed designed CCS systems, including varieties of recovered CO2 transportation. (C) 2013 The Authors. Published by Elsevier Ltd.
引用
收藏
页码:2519 / 2528
页数:10
相关论文
共 43 条
  • [21] Life Cycle Assessment of Advanced Zero Emission Combined Cycle Power Plants
    Ataei, A.
    Iranmanesh, A.
    Rashidi, Z.
    INTERNATIONAL JOURNAL OF ENVIRONMENTAL RESEARCH, 2012, 6 (03) : 801 - 814
  • [22] A Model for Generation Expansion Planning in Power Systems Considering Emission Costs
    Akbarzade, Hossein
    Amraee, Turaj
    2018 SMART GRID CONFERENCE (SGC), 2018, : 78 - 82
  • [23] Energy and environmental costs in transitioning to zero and low emission trucks for the Australian truck Fleet: An industry perspective
    Hensher, David A.
    Wei, Edward
    TRANSPORTATION RESEARCH PART A-POLICY AND PRACTICE, 2024, 185
  • [24] Performance evaluation of honeycomb shaped sorbent for sulfur removal in advanced oxy-fuel IGCC power generation plant
    Kobayashi, Makoto
    Akiho, Hiroyuki
    FUEL, 2017, 203 : 1015 - 1025
  • [25] Prospect of near-zero-emission IGCC power plants to decarbonize coal-fired power generation in China: Implications from the GreenGen project
    Xia, Changyou
    Ye, Bin
    Jiang, Jingjing
    Shu, Yutong
    JOURNAL OF CLEANER PRODUCTION, 2020, 271
  • [26] Advanced Exergoenvironmental Analysis of a Near-Zero Emission Power Plant with Chemical Looping Combustion
    Petrakopoulou, Fontina
    Tsatsaronis, George
    Morosuk, Tatiana
    ENVIRONMENTAL SCIENCE & TECHNOLOGY, 2012, 46 (05) : 3001 - 3007
  • [27] Proposal of ultra-high-efficiency zero-emission power generation systems
    Kawabata, Yasuharu
    Nakajima, Tatsuya
    Nakamura, Kazuo
    Hatae, Toru
    Tachikawa, Yuya
    Taniguchi, Shunsuke
    Matsuzaki, Yoshio
    Sasaki, Kazunari
    JOURNAL OF POWER SOURCES, 2020, 448
  • [28] Recent Advance of Zero Emission Technologies for Coal-based Power Generations Systems
    Wang, G. X.
    Feng, B.
    da Costa, J. C. Diniz
    Rudolph, V.
    2009 ASIA-PACIFIC POWER AND ENERGY ENGINEERING CONFERENCE (APPEEC), VOLS 1-7, 2009, : 3150 - 3153
  • [29] Zero-Emission Cement Plants with Advanced Amine-Based CO2 Capture
    Jiang, Kaiqi
    Yu, Hai
    Sun, Zening
    Lei, Zhiqi
    Li, Kangkang
    Wang, Lidong
    ENVIRONMENTAL SCIENCE & TECHNOLOGY, 2024, 58 (16) : 6978 - 6987
  • [30] Inventory management for one warehouse multi-retailer systems with carbon emission costs
    Li, Zhengyi
    Hai, Jiangtao
    COMPUTERS & INDUSTRIAL ENGINEERING, 2019, 130 : 565 - 574