Seismic vulnerability and mitigation during construction of cable-stayed bridges

被引:10
|
作者
Wilson, John C.
Holmes, Keith
机构
[1] McMaster Univ, Dept Civil Engn, Hamilton, ON L8S 4L7, Canada
[2] ND LEA Consultants Ltd, Vancouver, BC V6G 2T3, Canada
关键词
bridges; cable-stayed; seismic effects; cantilever; aerodynamics; cables; bridge construction;
D O I
10.1061/(ASCE)1084-0702(2007)12:3(364)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The implications of earthquake loading during balanced cantilever construction of a cable-stayed bridge are examined. Finite-element models of a cable-stayed bridge were developed and multiple ground motion time history records were used to study the seismic response at the base of the towers for six stages of balanced cantilever construction. Probabilistic seismic hazard relationships were used to relate ground motions to bridge responses. The results show that there can be a high probability of having seismic responses (forces/moments) in a partially completed bridge that exceed, often by a substantial margin, the 10%/50-year design level (0.21% per annum) for the full bridge. The maximum probability of exceedance per annum was found to be 20%. This occurs because during balanced-cantilever construction the structure is in a particularly precarious and vulnerable state. The efficacy of a seismic mitigation strategy based on the use of tie-down cables intended for aerodynamic stability during construction was investigated. This strategy was successful in reducing some of the seismic vulnerabilities so that probabilities of exceedance during construction dropped to below 1% per annum. Although applied to only one cable-stayed bridge, the same approach can be used for construction-stage vulnerability analysis of other long-span bridges.
引用
收藏
页码:364 / 372
页数:9
相关论文
共 50 条
  • [1] SEISMIC VULNERABILITY ANALYSIS OF CABLE-STAYED BRIDGE DURING ROTATION CONSTRUCTION
    Wang, Sukang
    Sun, Quansheng
    Yu, Haitao
    Wang, Hongyang
    CIVIL ENGINEERING JOURNAL-STAVEBNI OBZOR, 2022, 31 (03): : 384 - 399
  • [2] Structural stability of cable-stayed bridges during construction
    Hong-Jung Kim
    Deok Hee Won
    Young-Jong Kang
    Seungjun Kim
    International Journal of Steel Structures, 2017, 17 : 443 - 469
  • [3] Seismic Vulnerability Assessment of Long-Span Cable-Stayed Bridges
    Li, Gangjin
    Zhang, Wenhua
    ADVANCES IN CIVIL ENGINEERING, PTS 1-6, 2011, 255-260 : 2612 - +
  • [4] Structural stability of cable-stayed bridges during construction
    Kim, Hong-Jung
    Won, Deok Hee
    Kang, Young-Jong
    Kim, Seungjun
    INTERNATIONAL JOURNAL OF STEEL STRUCTURES, 2017, 17 (02) : 443 - 469
  • [6] Simulation of the construction of cable-stayed bridges
    Abraham, DM
    Halpin, DW
    CANADIAN JOURNAL OF CIVIL ENGINEERING, 1998, 25 (03) : 490 - 499
  • [7] Construction simulation of cable-stayed bridges
    Lozano-Galant, J. A.
    Xu, D.
    Turmo, J.
    MAINTENANCE, SAFETY, RISK, MANAGEMENT AND LIFE-CYCLE PERFORMANCE OF BRIDGES, 2018, : 813 - 819
  • [8] Study on vulnerability assessment of cable-stayed bridges
    Chang, C. C.
    Yan, D.
    SMART STRUCTURES AND MATERIALS 2006: SENSORS AND SMART STRUCTURES TECHNOLOGIES FOR CIVIL, MECHANICAL , AND AEROSPACE SYSTEMS, PTS 1 AND 2, 2006, 6174
  • [9] Seismic Response Analysis of Cable-Stayed Bridges
    Qiu, Wenliang
    Jiang, Meng
    Zhang, Xingbo
    TRENDS IN CIVIL ENGINEERING, PTS 1-4, 2012, 446-449 : 2290 - +
  • [10] Conceptual Seismic Design of Cable-Stayed Bridges
    Calvi, G. M.
    Sullivan, T. J.
    Villani, A.