Solving Stochastic Multi-Manned U-shaped Assembly Line Balancing Problem Using Differential Evolution Algorithm

被引:3
作者
Zakaraia, Mohammad [1 ]
Zaher, Hegazy [1 ]
Ragaa, Naglaa [1 ]
机构
[1] Cairo Univ, Fac Grad Studies Stat Res, 5 Ahmed Zewail, Dokki, Giza Governorat, Egypt
关键词
Metaheuristics; Differential evolution algorithm; U-shaped assembly line balancing problem; multi-manned assembly line balancing problem; Chance-constrained programming; WORKER ASSIGNMENT; MODEL; OPTIMIZATION;
D O I
10.4995/ijpme.2022.16084
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The U-shaped assembly lines help to have more flexibility than the straight assembly lines, where the operators can perform tasks in both sides of the line, the entrance and the exit sides. Having more than one operator in any station of the line can reduce the line length and thereby affects the number of produced products. This paper combines the U-shaped assembly line balancing problem with the multi-manned assembly line balancing problem in one problem. In addition, the processing times of the tasks are considered as stochastic, where they are represented as random variables with known means and variances. The problem is formulated as a mixed-integer linear programming and the cycle time constraints are formulated as chance-constraints. The proposed algorithm for solving the problem is a differential evolution algorithm. The parameter of the algorithm is optimized using experimental design and the computational results are done on 71 adapted problems selected from well-known benchmarks.
引用
收藏
页码:13 / 22
页数:10
相关论文
共 30 条
[1]   Applying genetic algorithms to the U-shaped assembly line balancing problem [J].
Ajenblit, DA ;
Wainwright, RL .
1998 IEEE INTERNATIONAL CONFERENCE ON EVOLUTIONARY COMPUTATION - PROCEEDINGS, 1998, :96-101
[2]   Constraint programming model for multi-manned assembly line balancing problem [J].
Cil, Zeynel Abidin ;
Kizilay, Damla .
COMPUTERS & OPERATIONS RESEARCH, 2020, 124
[3]   A new heuristic-based bi-objective simulated annealing method for U-shaped assembly line balancing [J].
Fathi, Masood ;
Jesus Alvarez, Maria ;
Rodriuez, Victoria .
EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, 2016, 10 (02) :145-169
[4]   A mathematical model and ant colony algorithm for multi-manned assembly line balancing problem [J].
Fattahi, Parviz ;
Roshani, Abdolreza ;
Roshani, Abdolhassan .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2011, 53 (1-4) :363-378
[5]   Balancing of parallel assembly lines [J].
Gokcen, Hadi ;
Agpak, Kursad ;
Benzer, Recep .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2006, 103 (02) :600-609
[6]   A simulated annealing algorithm based approach for balancing and sequencing of mixed-model U-lines [J].
Hamzadayi, Alper ;
Yildiz, Gokalp .
COMPUTERS & INDUSTRIAL ENGINEERING, 2013, 66 (04) :1070-1084
[7]   A genetic algorithm based approach for simultaneously balancing and sequencing of mixed-model U-lines with parallel workstations and zoning constraints [J].
Hamzadayi, Alper ;
Yildiz, Gokalp .
COMPUTERS & INDUSTRIAL ENGINEERING, 2012, 62 (01) :206-215
[8]   Balancing U-shaped assembly lines with resource dependent task times: A Simulated Annealing approach [J].
Jayaswal, Sachin ;
Agarwal, Prashant .
JOURNAL OF MANUFACTURING SYSTEMS, 2014, 33 (04) :522-534
[9]   Balancing straight and U-shaped assembly lines with resource dependent task times [J].
Kara, Yakup ;
Ozguven, Cemal ;
Yalcin, Nese ;
Atasagun, Yakup .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2011, 49 (21) :6387-6405
[10]   Assembly line balancing problems with multi-manned stations: a new mathematical formulation and Gantt based heuristic method [J].
Kellegoz, Talip .
ANNALS OF OPERATIONS RESEARCH, 2017, 253 (01) :377-404