In the present study, the feasibility of intercalating two cooling towers in the present circulation water system used at Almaraz Nuclear Power Plant, located at Campo Aranuelo district (SW Spain), has been technically evaluated in order to increase the efficiency of the thermodynamic cycle used at present. Thus, the working cycle has been analyzed, the power produced by the turbines being calculated as a function of the cooling circulation water temperature. Next, two natural convection counterflow cooling towers have been calculated in order to be installed in parallel with the present cooling system (Lake Arrocampo). The power obtained in the turbines provided with the new system has been estimated. Finally, a system combining both the cooling towers and the Lake Arrocampo has been proposed, the increment in power using one system or the other according to the weather conditions being calculated. (C) 2004 Elsevier Ltd. All rights reserved.