Tractable Risk Measures for the Selective Scheduling Problem with Sequence-Dependent Setup Times

被引:0
作者
Bruni, M. E. [1 ]
Khodaparasti, S. [1 ]
机构
[1] Univ Calabria, Dept Mech Energy & Management Engn, Arcavacata Di Rende, Italy
来源
OPERATIONS RESEARCH AND ENTERPRISE SYSTEMS, ICORES 2019 | 2020年 / 1162卷
关键词
Machine scheduling; Risk measure; Heuristic; VALUE-AT-RISK; ORDER ACCEPTANCE; ROBUST; OPTIMIZATION;
D O I
10.1007/978-3-030-37584-3_4
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Quantifying and minimizing the risk is a basic problem faced in a wide range of applications. Once the risk is explicitly quantified by a risk measure, the crucial and ambitious goal is to obtain risk-averse solutions, given the computational hurdle typically associated with optimization problems under risk. This is especially true for many difficult combinatorial problems, and notably for scheduling problems. This paper aims to present a few tractable risk measures for the selective scheduling problem with parallel identical machines and sequence-dependent setup times. We indicate how deterministic reformulations can be obtained when the distributional information is limited to first and second-order moment information for a broad class of risk measures. We propose an efficient heuristic for addressing the computational difficulty of the resulting models and we showcase the practical applicability of the proposed approach providing computational evidence on a set of benchmark instances.
引用
收藏
页码:70 / 84
页数:15
相关论文
共 50 条
[21]   A Discrete Artificial Bee Colony Algorithm for the Permutation Flowshop Scheduling Problem with Sequence-Dependent Setup Times [J].
Ince, Yavuz ;
Karabulut, Korhan ;
Tasgetiren, M. Fatih ;
Pan, Quan-ke .
2016 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION (CEC), 2016, :3401-3408
[22]   A scatter search approach to sequence-dependent setup times job shop scheduling [J].
Manikas, Andrew ;
Chang, Yih-Long .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2009, 47 (18) :5217-5236
[23]   Machine Scheduling with Sequence-dependent Setup Times using a Randomized Search Heuristic [J].
Montoya-Torres, Jairo R. ;
Soto-Ferrari, Milton ;
Gonzalez-Solano, Fernando ;
Alfonso-Lizarazo, Edgar H. .
CIE: 2009 INTERNATIONAL CONFERENCE ON COMPUTERS AND INDUSTRIAL ENGINEERING, VOLS 1-3, 2009, :28-+
[24]   A hybrid genetic algorithm for the hybrid flow shop scheduling problem with machine blocking and sequence-dependent setup times [J].
Ferreira Maciel, Ingrid Simoes ;
Prata, Bruno de Athayde ;
Nagano, Marcelo Seido ;
de Abreu, Levi Ribeiro .
JOURNAL OF PROJECT MANAGEMENT, 2022, :201-216
[25]   A discrete artificial bee colony algorithm for distributed hybrid flowshop scheduling problem with sequence-dependent setup times [J].
Li, Yingli ;
Li, Xinyu ;
Gao, Liang ;
Zhang, Biao ;
Pan, Quan-Ke ;
Tasgetiren, M. Fatih ;
Meng, Leilei .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2021, 59 (13) :3880-3899
[26]   A discrete differential evolution algorithm for flow shop group scheduling problem with sequence-dependent setup and transportation times [J].
Yuan, Shuaipeng ;
Li, Tieke ;
Wang, Bailin .
JOURNAL OF INTELLIGENT MANUFACTURING, 2021, 32 (02) :427-439
[27]   NEW HEURISTICS FOR THE NO-WAIT FLOWSHOP WITH SEQUENCE-DEPENDENT SETUP TIMES PROBLEM [J].
Araujo, Danielle Castro ;
Naganoa, Marcelo Seido .
BRAZILIAN JOURNAL OF OPERATIONS & PRODUCTION MANAGEMENT, 2015, 12 (02) :180-194
[28]   New heuristics for the no-wait flowshop with sequence-dependent setup times problem [J].
Marcelo Seido Nagano ;
Daniella Castro Araújo .
Journal of the Brazilian Society of Mechanical Sciences and Engineering, 2014, 36 :139-151
[29]   Production lot sizing and scheduling with non-triangular sequence-dependent setup times [J].
Clark, Alistair ;
Mahdieh, Masoumeh ;
Rangel, Socorro .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2014, 52 (08) :2490-2503
[30]   Using genetic algorithms and heuristics for job shop scheduling with sequence-dependent setup times [J].
Cheung, WM ;
Zhou, H .
ANNALS OF OPERATIONS RESEARCH, 2001, 107 (1-4) :65-81