Tractable Risk Measures for the Selective Scheduling Problem with Sequence-Dependent Setup Times

被引:0
作者
Bruni, M. E. [1 ]
Khodaparasti, S. [1 ]
机构
[1] Univ Calabria, Dept Mech Energy & Management Engn, Arcavacata Di Rende, Italy
来源
OPERATIONS RESEARCH AND ENTERPRISE SYSTEMS, ICORES 2019 | 2020年 / 1162卷
关键词
Machine scheduling; Risk measure; Heuristic; VALUE-AT-RISK; ORDER ACCEPTANCE; ROBUST; OPTIMIZATION;
D O I
10.1007/978-3-030-37584-3_4
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Quantifying and minimizing the risk is a basic problem faced in a wide range of applications. Once the risk is explicitly quantified by a risk measure, the crucial and ambitious goal is to obtain risk-averse solutions, given the computational hurdle typically associated with optimization problems under risk. This is especially true for many difficult combinatorial problems, and notably for scheduling problems. This paper aims to present a few tractable risk measures for the selective scheduling problem with parallel identical machines and sequence-dependent setup times. We indicate how deterministic reformulations can be obtained when the distributional information is limited to first and second-order moment information for a broad class of risk measures. We propose an efficient heuristic for addressing the computational difficulty of the resulting models and we showcase the practical applicability of the proposed approach providing computational evidence on a set of benchmark instances.
引用
收藏
页码:70 / 84
页数:15
相关论文
共 50 条
  • [21] A Discrete Artificial Bee Colony Algorithm for the Permutation Flowshop Scheduling Problem with Sequence-Dependent Setup Times
    Ince, Yavuz
    Karabulut, Korhan
    Tasgetiren, M. Fatih
    Pan, Quan-ke
    2016 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION (CEC), 2016, : 3401 - 3408
  • [22] Machine Scheduling with Sequence-dependent Setup Times using a Randomized Search Heuristic
    Montoya-Torres, Jairo R.
    Soto-Ferrari, Milton
    Gonzalez-Solano, Fernando
    Alfonso-Lizarazo, Edgar H.
    CIE: 2009 INTERNATIONAL CONFERENCE ON COMPUTERS AND INDUSTRIAL ENGINEERING, VOLS 1-3, 2009, : 28 - +
  • [23] A scatter search approach to sequence-dependent setup times job shop scheduling
    Manikas, Andrew
    Chang, Yih-Long
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2009, 47 (18) : 5217 - 5236
  • [24] A hybrid genetic algorithm for the hybrid flow shop scheduling problem with machine blocking and sequence-dependent setup times
    Ferreira Maciel, Ingrid Simoes
    Prata, Bruno de Athayde
    Nagano, Marcelo Seido
    de Abreu, Levi Ribeiro
    JOURNAL OF PROJECT MANAGEMENT, 2022, : 201 - 216
  • [25] A discrete differential evolution algorithm for flow shop group scheduling problem with sequence-dependent setup and transportation times
    Yuan, Shuaipeng
    Li, Tieke
    Wang, Bailin
    JOURNAL OF INTELLIGENT MANUFACTURING, 2021, 32 (02) : 427 - 439
  • [26] A discrete artificial bee colony algorithm for distributed hybrid flowshop scheduling problem with sequence-dependent setup times
    Li, Yingli
    Li, Xinyu
    Gao, Liang
    Zhang, Biao
    Pan, Quan-Ke
    Tasgetiren, M. Fatih
    Meng, Leilei
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2021, 59 (13) : 3880 - 3899
  • [27] NEW HEURISTICS FOR THE NO-WAIT FLOWSHOP WITH SEQUENCE-DEPENDENT SETUP TIMES PROBLEM
    Araujo, Danielle Castro
    Naganoa, Marcelo Seido
    BRAZILIAN JOURNAL OF OPERATIONS & PRODUCTION MANAGEMENT, 2015, 12 (02) : 180 - 194
  • [28] New heuristics for the no-wait flowshop with sequence-dependent setup times problem
    Marcelo Seido Nagano
    Daniella Castro Araújo
    Journal of the Brazilian Society of Mechanical Sciences and Engineering, 2014, 36 : 139 - 151
  • [29] Production lot sizing and scheduling with non-triangular sequence-dependent setup times
    Clark, Alistair
    Mahdieh, Masoumeh
    Rangel, Socorro
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2014, 52 (08) : 2490 - 2503
  • [30] Using genetic algorithms and heuristics for job shop scheduling with sequence-dependent setup times
    Cheung, WM
    Zhou, H
    ANNALS OF OPERATIONS RESEARCH, 2001, 107 (1-4) : 65 - 81