Tractable Risk Measures for the Selective Scheduling Problem with Sequence-Dependent Setup Times

被引:0
|
作者
Bruni, M. E. [1 ]
Khodaparasti, S. [1 ]
机构
[1] Univ Calabria, Dept Mech Energy & Management Engn, Arcavacata Di Rende, Italy
来源
OPERATIONS RESEARCH AND ENTERPRISE SYSTEMS, ICORES 2019 | 2020年 / 1162卷
关键词
Machine scheduling; Risk measure; Heuristic; VALUE-AT-RISK; ORDER ACCEPTANCE; ROBUST; OPTIMIZATION;
D O I
10.1007/978-3-030-37584-3_4
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Quantifying and minimizing the risk is a basic problem faced in a wide range of applications. Once the risk is explicitly quantified by a risk measure, the crucial and ambitious goal is to obtain risk-averse solutions, given the computational hurdle typically associated with optimization problems under risk. This is especially true for many difficult combinatorial problems, and notably for scheduling problems. This paper aims to present a few tractable risk measures for the selective scheduling problem with parallel identical machines and sequence-dependent setup times. We indicate how deterministic reformulations can be obtained when the distributional information is limited to first and second-order moment information for a broad class of risk measures. We propose an efficient heuristic for addressing the computational difficulty of the resulting models and we showcase the practical applicability of the proposed approach providing computational evidence on a set of benchmark instances.
引用
收藏
页码:70 / 84
页数:15
相关论文
共 50 条
  • [1] A Selective Scheduling Problem with Sequence-dependent Setup Times: A Risk-averse Approach
    Bruni, Maria Elena
    Khodaparasti, Sara
    Beraldi, Patrizia
    ICORES: PROCEEDINGS OF THE 8TH INTERNATIONAL CONFERENCE ON OPERATIONS RESEARCH AND ENTERPRISE SYSTEMS, 2019, : 195 - 201
  • [2] The single machine scheduling problem with sequence-dependent setup times and a learning effect on processing times
    Mustu, Settar
    Eren, Tamer
    APPLIED SOFT COMPUTING, 2018, 71 : 291 - 306
  • [3] Single machine scheduling problem with stochastic sequence-dependent setup times
    Ertem, Mehmet
    Ozcelik, Feristah
    Sarac, Tugba
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2019, 57 (10) : 3273 - 3289
  • [4] The distributionally robust machine scheduling problem with job selection and sequence-dependent setup times
    Bruni, M. E.
    Khodaparasti, S.
    Demeulemeester, E.
    COMPUTERS & OPERATIONS RESEARCH, 2020, 123
  • [5] Heuristics for the Hybrid Flow Shop Scheduling Problem with Sequence-Dependent Setup times
    Yong, Liao
    Zhantao, Li
    Xiang, Li
    Chenfeng, Peng
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2022, 2022
  • [6] Solving the flexible job shop scheduling problem with sequence-dependent setup times
    Shen, Liji
    Dauzere-Peres, Stephane
    Neufeld, Janis S.
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2018, 265 (02) : 503 - 516
  • [7] The capacitated lot-sizing and scheduling problem with sequence-dependent setup costs and setup times
    Gupta, D
    Magnusson, T
    COMPUTERS & OPERATIONS RESEARCH, 2005, 32 (04) : 727 - 747
  • [8] Advanced Algorithms for the Reclaimer Scheduling Problem with Sequence-Dependent Setup Times and Availability Constraints
    Benbrik, Oualid
    Benmansour, Rachid
    Elidrissi, Abdelhak
    Sifaleras, Angelo
    METAHEURISTICS, MIC 2024, PT I, 2024, 14753 : 291 - 308
  • [9] Two-machine robotic cell scheduling problem with sequence-dependent setup times
    Zarandi, M. H. Fazel
    Mosadegh, H.
    Fattahi, M.
    COMPUTERS & OPERATIONS RESEARCH, 2013, 40 (05) : 1420 - 1434
  • [10] A deadlock-free scheduling with sequence-dependent setup times
    Hehua Zhang
    Ming Gu
    Xiaoyu Song
    The International Journal of Advanced Manufacturing Technology, 2009, 45 : 593 - 602