The Influence and Countermeasures of Underground Goaf Under Open-pit Mine

被引:0
|
作者
Ding Xinpin [1 ,2 ]
Zhao Ruhui [1 ,2 ]
Zhou You [1 ,2 ]
Zhang Xuechao [1 ,2 ]
机构
[1] China Coal Res Inst, Beijing 100013, Peoples R China
[2] State Key Lab High Efficient Min & Clean Utilizat, Beijing 100013, Peoples R China
来源
PROCEEDINGS OF 2015 INTERNATIONAL SYMPOSIUM - SAFETY AND HIGH EFFICIENCY MINING IN COAL | 2015年
关键词
Open-pit mining; Underground goaf; Security thickness of roof; Risk assessment;
D O I
暂无
中图分类号
TD [矿业工程];
学科分类号
0819 ;
摘要
At present many open-pit mines face serious threat of underground goaf in China. Take exploration and governance of goaf of a certain open pit mine of Pingshuo mining area as engineering instance, the risk assessment method and the method for determining the best treatment time of open-pit mine goaf was proposed, according to such theories as structural mechanics and mechanics of materials, established corresponding relations between the smallest security thickness of goaf and goaf span. This has extremely vital significance for guiding the safe production of open-pit mine.
引用
收藏
页码:172 / 179
页数:8
相关论文
共 50 条
  • [21] Effect of geometric parameters of a restraining embankment on the stabilization of a deep open-pit mine excavation
    Lichun Jiang
    Gege Wang
    Luanluan Xue
    Lijuan Jia
    Bulletin of Engineering Geology and the Environment, 2023, 82
  • [22] Model test on slope deformation and failure caused by transition from open-pit to underground mining
    Zhang, Bin
    Wang, Hanxun
    Huang, Jie
    Xu, Nengxiong
    GEOMECHANICS AND ENGINEERING, 2019, 19 (02) : 167 - 178
  • [23] Decision support for fleet allocation and contract renegotiation in contracted open-pit mine blasting operations
    Perez, Juan
    Maldonado, Sebastian
    Gonzalez-Ramirez, Rosa
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2018, 204 : 59 - 69
  • [24] A variable neighbourhood descent algorithm for the open-pit mine production scheduling problem with metal uncertainty
    Lamghari, Amina
    Dimitrakopoulos, Roussos
    Ferland, Jacques A.
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2014, 65 (09) : 1305 - 1314
  • [25] A diversified Tabu search approach for the open-pit mine production scheduling problem with metal uncertainty
    Lamghari, Amina
    Dimitrakopoulos, Roussos
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2012, 222 (03) : 642 - 652
  • [26] Scheduling in iron ore open-pit mining
    Ibrahimov, Maksud
    Mohais, Arvind
    Schellenberg, Sven
    Michalewicz, Zbigniew
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2014, 72 (5-8): : 1021 - 1037
  • [27] Scheduling in iron ore open-pit mining
    Maksud Ibrahimov
    Arvind Mohais
    Sven Schellenberg
    Zbigniew Michalewicz
    The International Journal of Advanced Manufacturing Technology, 2014, 72 : 1021 - 1037
  • [28] Experimental study on reconstruction material of impervious layer in open-pit mine external dump in arid area
    Ma L.
    Wang X.
    Zhang Q.
    Luo Q.
    Hu Y.
    Ma N.
    Li M.
    Meitan Kexue Jishu/Coal Science and Technology (Peking), 2024, 52 (05): : 345 - 353
  • [29] Stochastic Final Pit Limits: An Efficient Frontier Analysis under Geological Uncertainty in the Open-Pit Mining Industry
    Jelvez, Enrique
    Morales, Nelson
    Ortiz, Julian M.
    MATHEMATICS, 2022, 10 (01)
  • [30] Numerical Modelling Challenges in Rock Engineering with Special Consideration of Open Pit to Underground Mine Interaction
    Shapka-Fels, Tia
    Elmo, Davide
    GEOSCIENCES, 2022, 12 (05)