Two-level unit commitment and reserve level adjustment considering large-scale wind power integration

被引:22
|
作者
Wei, Wei [1 ]
Liu, Feng [1 ]
Mei, Shengwei [1 ]
Lu, En [2 ]
机构
[1] Tsinghua Univ, Dept Elect Engn & Appl Elect Technol, State Key Lab Power Syst, Beijing 100084, Peoples R China
[2] Guangdong Power Gird Co, Guangzhou, Guangdong, Peoples R China
来源
INTERNATIONAL TRANSACTIONS ON ELECTRICAL ENERGY SYSTEMS | 2014年 / 24卷 / 12期
基金
中国国家自然科学基金;
关键词
adjustable robust optimization; spinning reserve; uncertainty; unit commitment; wind power; OPTIMIZATION;
D O I
10.1002/etep.1812
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Integrating wind power generation into bulk power grids imposes significant challenging to system operations due to the stochastic variation and limited predictability of wind power generation. One of the key issues is how to optimally schedule various units and determine a proper spinning reserve level to guarantee a reliable operation of the integrated system in a robust and economic manner. In this paper, we propose a two-level unit commitment (TLUC) for power systems facing large uncertainties in the context of adjustable robust optimization. The commitment decision acts as first-stage decisions that need to be robust against uncertainty, whereas the output decision acts as adjustable decisions that is decided after uncertainty is revealed. This decision mechanism naturally decomposes a conventional unit commitment (UC) problem into two levels, the upper level provides unit working status, whereas the lower level checks if there is at least one dispatch solution under uncertainty subject to the status. Unlike conventional UC, where the reserve level is fixed from operating experiences, in TLUC, the reserve level also acts as a decision variable in the upper level that controls the robustness of UC decisions. A heuristic algorithm is developed to solve this TLUC problem, providing the robust UC decision against uncertainty as well as the minimal spinning reserve level required to maintain reliability. Numerical experiments are carried out on the IEEE 39-bus system and large-scale realistic Guangdong power grid in China and demonstrate the effectiveness of our approach. Copyright (c) 2013 John Wiley & Sons, Ltd.
引用
收藏
页码:1726 / 1746
页数:21
相关论文
共 50 条
  • [21] Decomposition algorithm for large-scale two-stage unit-commitment
    van Ackooij, Wim
    Malick, Jerome
    ANNALS OF OPERATIONS RESEARCH, 2016, 238 (1-2) : 587 - 613
  • [22] Stochastic Decoupling Collaborative Dispatch Considering Integration of Large-scale Electric Vehicles and Wind Power
    Ge X.
    Hao G.
    Xia S.
    Fu Y.
    Dianli Xitong Zidonghua/Automation of Electric Power Systems, 2020, 44 (04): : 54 - 62
  • [23] Assessment on flexibility of a power grid with large-scale wind farm integration considering demand response
    Zhao F.
    Yu X.
    Du S.
    Guo C.
    Xing H.
    Fang Y.
    Dianli Xitong Baohu yu Kongzhi/Power System Protection and Control, 2021, 49 (01): : 42 - 51
  • [24] Joint unit commitment model for hydro and hydrogen power to adapt to large-scale photovoltaic power
    Gong, Yu
    Liu, Tingxi
    Liu, Pan
    Tong, Xin
    ENERGY CONVERSION AND MANAGEMENT, 2024, 317
  • [25] Network-Constrained Unit Commitment Based on Reserve Models Fully Considering the Stochastic Characteristics of Wind Power
    Wang, Gang
    You, Dahai
    Zhang, Zhe
    Dai, Li
    Zou, Qi
    Liu, Hengwei
    ENERGIES, 2018, 11 (02)
  • [26] A novel unit commitment model considering electric heating load and its effects on wind power integration
    Zhang, Ning
    Song, Yukun
    Shen, Bo
    Li, Yanning
    PROCEEDINGS OF 2017 CHINA INTERNATIONAL ELECTRICAL AND ENERGY CONFERENCE (CIEEC 2017), 2017, : 826 - 831
  • [27] Game Theoretical Scheduling of Modern Power Systems with Large-scale Wind Power Integration
    Wei, Wei
    Liu, Feng
    Mei, Shengwei
    2012 IEEE POWER AND ENERGY SOCIETY GENERAL MEETING, 2012,
  • [28] Electric Vehicle Fleet Integration in a Virtual Power Plant With Large-Scale Wind Power
    Wang, Wei
    Chen, Peng
    Zeng, Deliang
    Liu, Jizhen
    IEEE TRANSACTIONS ON INDUSTRY APPLICATIONS, 2020, 56 (05) : 5924 - 5931
  • [29] A novel straightforward unit commitment method for large-scale power systems
    Hosseini, Seyed Hamid
    Khodaei, Amin
    Aminifar, Farrokh
    IEEE TRANSACTIONS ON POWER SYSTEMS, 2007, 22 (04) : 2134 - 2143
  • [30] Multi-area unit commitment for large-scale power systems
    Tseng, CL
    Guan, X
    Svoboda, AJ
    IEE PROCEEDINGS-GENERATION TRANSMISSION AND DISTRIBUTION, 1998, 145 (04) : 415 - 421