Two-level unit commitment and reserve level adjustment considering large-scale wind power integration

被引:22
|
作者
Wei, Wei [1 ]
Liu, Feng [1 ]
Mei, Shengwei [1 ]
Lu, En [2 ]
机构
[1] Tsinghua Univ, Dept Elect Engn & Appl Elect Technol, State Key Lab Power Syst, Beijing 100084, Peoples R China
[2] Guangdong Power Gird Co, Guangzhou, Guangdong, Peoples R China
来源
INTERNATIONAL TRANSACTIONS ON ELECTRICAL ENERGY SYSTEMS | 2014年 / 24卷 / 12期
基金
中国国家自然科学基金;
关键词
adjustable robust optimization; spinning reserve; uncertainty; unit commitment; wind power; OPTIMIZATION;
D O I
10.1002/etep.1812
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Integrating wind power generation into bulk power grids imposes significant challenging to system operations due to the stochastic variation and limited predictability of wind power generation. One of the key issues is how to optimally schedule various units and determine a proper spinning reserve level to guarantee a reliable operation of the integrated system in a robust and economic manner. In this paper, we propose a two-level unit commitment (TLUC) for power systems facing large uncertainties in the context of adjustable robust optimization. The commitment decision acts as first-stage decisions that need to be robust against uncertainty, whereas the output decision acts as adjustable decisions that is decided after uncertainty is revealed. This decision mechanism naturally decomposes a conventional unit commitment (UC) problem into two levels, the upper level provides unit working status, whereas the lower level checks if there is at least one dispatch solution under uncertainty subject to the status. Unlike conventional UC, where the reserve level is fixed from operating experiences, in TLUC, the reserve level also acts as a decision variable in the upper level that controls the robustness of UC decisions. A heuristic algorithm is developed to solve this TLUC problem, providing the robust UC decision against uncertainty as well as the minimal spinning reserve level required to maintain reliability. Numerical experiments are carried out on the IEEE 39-bus system and large-scale realistic Guangdong power grid in China and demonstrate the effectiveness of our approach. Copyright (c) 2013 John Wiley & Sons, Ltd.
引用
收藏
页码:1726 / 1746
页数:21
相关论文
共 50 条
  • [11] Dynamic Frequency Constraint Unit Commitment in Large-scale Wind Power Grid Connection
    Wang B.
    Yang D.
    Cai G.
    Dianwang Jishu/Power System Technology, 2020, 44 (07): : 2513 - 2519
  • [12] Robust Optimization of Static Reserve Planning With Large-Scale Integration of Wind Power: A Game Theoretic Approach
    Mei, Shengwei
    Zhang, De
    Wang, Yingying
    Liu, Feng
    Wei, Wei
    IEEE TRANSACTIONS ON SUSTAINABLE ENERGY, 2014, 5 (02) : 535 - 545
  • [13] Risk-based Reserve Coordinative Unit Commitment for a Large-scale Wind-storage System
    Zhang, Yumin
    Han, Xueshan
    Xu, Bo
    Wang, Yong
    Wang, Mengxia
    Ye, Pingfeng
    ELECTRIC POWER COMPONENTS AND SYSTEMS, 2018, 46 (19-20) : 2004 - 2020
  • [14] Unscented Transformation-based Fast Scheduling Optimization for Large-Scale Unit Commitment Considering Uncertainties of Wind and Solar Power
    Zheng, J. H.
    Kou, Y. N.
    Li, Zhigang
    Wu, Q. H.
    2017 IEEE POWER & ENERGY SOCIETY GENERAL MEETING, 2017,
  • [15] Adjustable Robust Real-Time Power Dispatch With Large-Scale Wind Power Integration
    Li, Zhigang
    Wu, Wenchuan
    Zhang, Boming
    Wang, Bin
    IEEE TRANSACTIONS ON SUSTAINABLE ENERGY, 2015, 6 (02) : 357 - 368
  • [16] Integration of wind generation uncertainties into frequency dynamic constrained unit commitment considering reserve and plug in electric vehicles
    Mousavi-Taghiabadi, Seyed Mohammadreza
    Sedighizadeh, Mostafa
    Zangiabadi, Mansoureh
    Fini, Alireza Sheikhi
    JOURNAL OF CLEANER PRODUCTION, 2020, 276
  • [17] A Fully Parallel Stochastic Multiarea Power System Operation Considering Large-Scale Wind Power Integration
    Khanabadi, Mojtaba
    Fu, Yong
    Gong, Lin
    IEEE TRANSACTIONS ON SUSTAINABLE ENERGY, 2018, 9 (01) : 138 - 147
  • [18] A MIQCP formulation to solve the unit commitment problem for large-scale power systems
    Alvarez Lopez, Juan
    Ceciliano-Meza, Jose L.
    Guillen Moya, Isaias
    Nieva Gomez, Rolando
    INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2012, 36 (01) : 68 - 75
  • [19] Fuzzy Mid Term Unit Commitment Considering Large Scale Wind Farms
    Siahkali, H.
    2008 IEEE 2ND INTERNATIONAL POWER AND ENERGY CONFERENCE: PECON, VOLS 1-3, 2008, : 1227 - 1232
  • [20] Review of Generation Schedule Methods with Large-Scale Wind Power Integration
    Liu Bin
    Zhou Jingyang
    Pan Yi
    Li Qiang
    Zhou Haiming
    Ding Qiang
    2011 ASIA-PACIFIC POWER AND ENERGY ENGINEERING CONFERENCE (APPEEC), 2011,