Project management and scheduling PREFACE

被引:4
作者
Caramia, Massimiliano [1 ]
机构
[1] Univ Roma Tor Vergata, Dept Enterprise Engn, Rome, Italy
关键词
MODELS;
D O I
10.1007/s10479-019-03414-9
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
引用
收藏
页码:1 / 8
页数:8
相关论文
共 9 条
[1]   Nash equilibria for the multi-agent project scheduling problem with controllable processing times [J].
Agnetis, Alessandro ;
Briand, Cyril ;
Billaut, Jean-Charles ;
Sucha, Premysl .
JOURNAL OF SCHEDULING, 2015, 18 (01) :15-27
[2]  
[Anonymous], 2015, Handbook on Project Management and Scheduling
[3]  
Blazewicz J., 1993, SCHEDULING COMPUTER, P52
[4]   An overview of recovery models and algorithms for real-time railway rescheduling [J].
Cacchiani, Valentina ;
Huisman, Dennis ;
Kidd, Martin ;
Kroon, Leo ;
Toth, Paolo ;
Veelenturf, Lucas ;
Wagenaar, Joris .
TRANSPORTATION RESEARCH PART B-METHODOLOGICAL, 2014, 63 :15-37
[5]   A portfolio-evaluation framework for selecting R&D projects [J].
Chien, CF .
R & D MANAGEMENT, 2002, 32 (04) :359-368
[6]  
Goldratt E.M., 1997, CRITICAL CHAIN
[7]   Managing Underperformance Risk in Project Portfolio Selection [J].
Hall, Nicholas G. ;
Long, Daniel Zhuoyu ;
Qi, Jin ;
Sim, Melvyn .
OPERATIONS RESEARCH, 2015, 63 (03) :660-675
[8]   Real-time rescheduling and disruption management for public transit [J].
Lai, David S. W. ;
Leung, Janny M. Y. .
TRANSPORTMETRICA B-TRANSPORT DYNAMICS, 2018, 6 (01) :17-33
[9]   Non-identical parallel-machine scheduling research with minimizing total weighted completion times: Models, relaxations and algorithms [J].
Li, Kai ;
Yang, Shan-Lin .
APPLIED MATHEMATICAL MODELLING, 2009, 33 (04) :2145-2158