Scheduling in kanban-controlled flowshops to minimise the makespan of containers

被引:7
作者
Ramanan, GV [1 ]
Rajendran, C [1 ]
机构
[1] Indian Inst Technol, Dept Human Social Sci, Ind Management Div, Madras 600036, Tamil Nadu, India
关键词
kanban; makespan; scheduling;
D O I
10.1007/s001700300040
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In this paper we deal with the problem of scheduling in a kanban-controlled flowshop with material handling and finite input and output buffer storage between workstations. The objective is to minimise the makespan of containers. A heuristic algorithm, based on the simulated annealing (SA) technique, is developed. We present a new perturbation scheme and test the effectiveness of the proposed simulated annealing algorithm for solving the kanban-controlled flowshop scheduling problems. The proposed SA algorithm is evaluated relative to the existing heuristic. The results of the computational evaluation reveal that the proposed SA algorithm performs better than the existing heuristic.
引用
收藏
页码:348 / 354
页数:7
相关论文
共 22 条
[1]  
Baker KR., 1974, Introduction to Sequencing and Scheduling
[2]   A tabu search approach for the flow shop scheduling problem [J].
Ben-Daya, M ;
Al-Fawzan, M .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1998, 109 (01) :88-95
[3]  
Berkeley B. J., 1992, Production and Operations Management, V1, P393, DOI 10.1111/j.1937-5956.1992.tb00004.x
[4]  
CAMPBELL HG, 1970, MANAGE SCI B-APPL, V16, pB630
[5]   EVALUATION OF FLOW SHOP SEQUENCING HEURISTICS [J].
DANNENBRING, DG .
MANAGEMENT SCIENCE, 1977, 23 (11) :1174-1182
[6]  
DUMOLIEN WJ, 1983, IND ENG, V15, P72
[7]   SIMULATED ANNEALING - A TOOL FOR OPERATIONAL-RESEARCH [J].
EGLESE, RW .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1990, 46 (03) :271-281
[8]  
French S., 1982, Sequencing and Scheduling
[9]   A survey of machine scheduling problems with blocking and no-wait in process [J].
Hall, NG ;
Sriskandarajah, C .
OPERATIONS RESEARCH, 1996, 44 (03) :510-525
[10]   Determination of the number of containers, production kanbans and withdrawal kanbans; and scheduling in kanban flowshops - Part 2 [J].
Hemamalini, B ;
Rajendran, C .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2000, 38 (11) :2549-2572