Reception of C4FM and CQPSK Signals in APCO Project-25

被引:0
作者
Zorlu, Hueseyin Ercuement [1 ]
Ceven, Murat [1 ]
Arslan, Hueseyin [2 ]
机构
[1] TUBITAK UEKAE, PK 74, TR-41470 Gebze, Kocaeli, Turkey
[2] Univ S Florida, Dept Elect Engn, Tampa, FL 33620 USA
来源
2009 IEEE 17TH SIGNAL PROCESSING AND COMMUNICATIONS APPLICATIONS CONFERENCE, VOLS 1 AND 2 | 2009年
关键词
D O I
暂无
中图分类号
TP3 [计算技术、计算机技术];
学科分类号
0812 ;
摘要
In the first phase of APCO Project-25, Phase-I, the C4FM modulation is defined for the transmission, with a bandwidth of 12.5 kHz. However in Phase-II, CQPSK modulation based transmission is defined with the bandwidth of 6.25 kHz to increase spectral efficiency. This results in a receiver structure in Phase-II, which is capable of demodulating both C4FM and CQPSK signals so that backward compatibility is obtained with Phase-I signals. While this common demodulator facilitates a single receiver structure, on the other hand frequency demodulator based structure becomes unavoidable for CQPSK. In this paper, we propose a complete receiver structure for APCO P-25. The proposed receiver structure consists of four major units; frequency discriminator, frame synchronization, sampling phase and sample clock offset correction, and frequency offset recovery units. This structure is realized in computer environment and BER performances of both modulations are evaluated under various multipath fading channel, sampling clock error, and frequency offset error conditions.
引用
收藏
页码:959 / +
页数:2
相关论文
共 5 条
[1]  
CHENNAKESHU S, 1993, IEEE T VEHICULAR TEC, V42
[2]  
CHONG YJ, 2004, IEEE 5 INT S PERS IN
[3]  
LIU CL, 1989, IEEE 39 VEH TECHN C
[4]  
*TEL IND ASS, 1995, TIAEIA102A
[5]  
*TEL IND ASS, 1998, TIAEIA102BAAA