Applying hybrid Monte Carlo Tree Search methods to Risk-Aware Project Scheduling Problem

被引:26
作者
Waledzik, Karol [1 ]
Mandziuk, Jacek [1 ]
机构
[1] Warsaw Univ Technol, Fac Math & Informat Sci, Warsaw, Poland
关键词
Resource-Constrained Project Scheduling; Problem; Risk-Aware Project Scheduling Problem; UCT; MCTS; GRASP; RCPSP; RAPSP; GAME; ALGORITHMS; RCPSP;
D O I
10.1016/j.ins.2017.08.049
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In this paper we investigate an application of hybrid Monte Carlo Tree Search (MCTS) based algorithms to solving dynamic decision making problems. We employ UCT (the most popular MCTS approach) in combination with well-known Resource Constrained Project Scheduling Problem (RCPSP) and Stochastic Resource Constrained Project Scheduling Problem (SRCPSP) solvers to devise strategies for a generic and highly dynamic version of RCPSP, which we call Risk-Aware Project Scheduling Problem (RAPSP). We compare these strategies' performance with results of both pure MCTS approach and non-MCTS solvers for projects of varied characteristics. We reach a conclusion that proposed hybrid simulation-heuristic methods are promising approaches to dynamic decision making problems, RAPSP in particular. Consequently, we argue that more research effort should be directed to applications of MCTS algorithm outside the domain of game playing, with which it is commonly associated. At the same time, to the best of our knowledge, this paper is the first attempt at defining generalized SRCPSP model encompassing arbitrary risks and risk response / mitigation strategies as an optimization problem and applying Computational Intelligence methods to build fully-automated decision making systems. We strongly believe it to be a research direction worth further investigation, combining project scheduling, risk management and metaheuristic optimization techniques into a well-defined platform allowing direct comparisons of different strategies. (C) 2017 Elsevier Inc. All rights reserved.
引用
收藏
页码:450 / 468
页数:19
相关论文
empty
未找到相关数据