Multi-period investment pathways - Modeling approaches to design distributed energy systems under uncertainty

被引:16
|
作者
Bohlayer, Markus [1 ,2 ]
Buerger, Adrian [1 ,3 ]
Fleschutz, Markus [1 ,4 ]
Braun, Marco [1 ]
Zoettl, Gregor [2 ,5 ]
机构
[1] Karlsruhe Univ Appl Sci, Inst Refrigerat Air Conditioning & Environm Engn, Moltkestr 30, D-76133 Karlsruhe, Germany
[2] Friedrich Alexander Univ Erlangen Nurnberg, Econ Ind Org & Energy Markets, Lange Gasse 20, D-90403 Nurnberg, Germany
[3] Univ Freiburg, Dept Microsyst Engn IMTEK, Syst Control & Optimizat Lab, Georges Koehler Allee 102, D-79110 Freiburg, Germany
[4] Cork Inst Technol, Dept Proc Energy & Transport Engn, Rossa Ave, Bishopstown T12 P928, Cork, Ireland
[5] Energie Campus Nurnberg,Further Str 250, D-90429 Nurnberg, Germany
关键词
Distributed energy systems; Mixed-integer optimization; Uncertainty; Multi-period investment; Economic planning; Multi-modal energy systems; OPTIMIZATION;
D O I
10.1016/j.apenergy.2020.116368
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Multi-modal distributed energy system planning is applied in the context of smart grids, industrial energy supply, and in the building energy sector. In real-world applications, these systems are commonly characterized by existing system structures of different age where monitoring and investment are conducted in a closed-loop, with the iterative possibility to invest. The literature contains two main approaches to approximate this computationally intensive multi-period investment problem. The first approach simplifies the temporal decision-making process collapsing the multi-stage decision to a two-stage decision, considering uncertainty in the second stage decision variables. The second approach considers multi-period investments under the assumption of perfect foresight. In this work, we propose a multi-stage stochastic optimization model that captures multi-period investment decisions under uncertainty and solves the problem to global optimality, serving as a first-best benchmark to the problem. To evaluate the performance of conventional approaches applied in a multi-year setup, we propose a rolling horizon heuristic that on the one hand reveals the performance of conventional approaches applied in a multi-period set-up and on the other hand enables planners to identify approximate solutions to the original multi-stage stochastic problem. We conduct a real-world case study and investigate solution quality as well as the computational performance of the proposed approaches. Our findings indicate that the approximation of multi-period investments by two-stage stochastic approaches yield the best results regarding constraint satisfaction, while deterministic multi-period approximations yield better economic and computational performance.
引用
收藏
页数:16
相关论文
共 50 条
  • [21] Pricing decision in a multi-period hub location problem under uncertainty: a mathematical model
    Bidoki, Mandieh Zare
    Galankashi, Masoud Rahiminezhad
    Setak, Mostafa
    INTERNATIONAL JOURNAL OF VALUE CHAIN MANAGEMENT, 2021, 12 (04) : 370 - 399
  • [22] Multi-period human evacuation model for passenger ships under walking speed uncertainty
    Arshad, Hossein
    Emblemsvag, Jan
    Li, Guoyuan
    OCEAN ENGINEERING, 2024, 309
  • [23] A multi-period MILP model for the investment and design planning of a national-level complex renewable energy supply system
    Han, Seulki
    Kim, Jiyong
    RENEWABLE ENERGY, 2019, 141 : 736 - 750
  • [24] A Temporal Neural Network Model for Probabilistic Multi-Period Forecasting of Distributed Energy Resources
    Loschenbrand, Markus
    IEEE ACCESS, 2021, 9 : 147029 - 147041
  • [25] Multi-period electricity distribution network investment planning under demand coincidence in the smart grid
    Ruede, Lenard
    Gust, Gunther
    Neumann, Dirk
    ANNALS OF OPERATIONS RESEARCH, 2024,
  • [26] Distributed Generation Expansion Planning Considering Load Growth Uncertainty: A Novel Multi-period Stochastic Model
    Molla, J. Hosseini
    Barforoushi, T.
    Firouzjaee, J. Adabi
    INTERNATIONAL JOURNAL OF ENGINEERING, 2018, 31 (03): : 405 - 414
  • [27] A Multi-Period Approach for the Optimal Energy Retrofit Planning of Street Lighting Systems
    Carli, Raffaele
    Dotoli, Mariagrazia
    Pellegrino, Roberta
    APPLIED SCIENCES-BASEL, 2019, 9 (05):
  • [28] Multi-period emergency facility location-routing problems under uncertainty and risk aversion
    Hu, Qing-Mi
    Hu, Yan
    Li, Xiaoping
    SOCIO-ECONOMIC PLANNING SCIENCES, 2024, 96
  • [29] Multi-period integrated planning for vaccination station location and medical professional assignment under uncertainty
    Lai, Xiaofan
    Lu, Xiaolong
    Yu, Xinyao
    Zhu, Ning
    COMPUTERS & INDUSTRIAL ENGINEERING, 2021, 161 (161)
  • [30] Multi-period planning of closed-loop supply chain with carbon policies under uncertainty
    Mohammed, Fareeduddin
    Selim, Shokri Z.
    Hassan, Adnan
    Syed, Mujahid Naqeebuddin
    TRANSPORTATION RESEARCH PART D-TRANSPORT AND ENVIRONMENT, 2017, 51 : 146 - 172