Multi-period investment pathways - Modeling approaches to design distributed energy systems under uncertainty

被引:16
|
作者
Bohlayer, Markus [1 ,2 ]
Buerger, Adrian [1 ,3 ]
Fleschutz, Markus [1 ,4 ]
Braun, Marco [1 ]
Zoettl, Gregor [2 ,5 ]
机构
[1] Karlsruhe Univ Appl Sci, Inst Refrigerat Air Conditioning & Environm Engn, Moltkestr 30, D-76133 Karlsruhe, Germany
[2] Friedrich Alexander Univ Erlangen Nurnberg, Econ Ind Org & Energy Markets, Lange Gasse 20, D-90403 Nurnberg, Germany
[3] Univ Freiburg, Dept Microsyst Engn IMTEK, Syst Control & Optimizat Lab, Georges Koehler Allee 102, D-79110 Freiburg, Germany
[4] Cork Inst Technol, Dept Proc Energy & Transport Engn, Rossa Ave, Bishopstown T12 P928, Cork, Ireland
[5] Energie Campus Nurnberg,Further Str 250, D-90429 Nurnberg, Germany
关键词
Distributed energy systems; Mixed-integer optimization; Uncertainty; Multi-period investment; Economic planning; Multi-modal energy systems; OPTIMIZATION;
D O I
10.1016/j.apenergy.2020.116368
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Multi-modal distributed energy system planning is applied in the context of smart grids, industrial energy supply, and in the building energy sector. In real-world applications, these systems are commonly characterized by existing system structures of different age where monitoring and investment are conducted in a closed-loop, with the iterative possibility to invest. The literature contains two main approaches to approximate this computationally intensive multi-period investment problem. The first approach simplifies the temporal decision-making process collapsing the multi-stage decision to a two-stage decision, considering uncertainty in the second stage decision variables. The second approach considers multi-period investments under the assumption of perfect foresight. In this work, we propose a multi-stage stochastic optimization model that captures multi-period investment decisions under uncertainty and solves the problem to global optimality, serving as a first-best benchmark to the problem. To evaluate the performance of conventional approaches applied in a multi-year setup, we propose a rolling horizon heuristic that on the one hand reveals the performance of conventional approaches applied in a multi-period set-up and on the other hand enables planners to identify approximate solutions to the original multi-stage stochastic problem. We conduct a real-world case study and investigate solution quality as well as the computational performance of the proposed approaches. Our findings indicate that the approximation of multi-period investments by two-stage stochastic approaches yield the best results regarding constraint satisfaction, while deterministic multi-period approximations yield better economic and computational performance.
引用
收藏
页数:16
相关论文
共 50 条
  • [1] Multi-period transportation network design under demand uncertainty
    Ukkusuri, Satish V.
    Patil, Gopal
    TRANSPORTATION RESEARCH PART B-METHODOLOGICAL, 2009, 43 (06) : 625 - 642
  • [2] A review of uncertainty characterisation approaches for the optimal design of distributed energy systems
    Mavromatidis, Georgios
    Orehounig, Kristina
    Carmeliet, Jan
    RENEWABLE & SUSTAINABLE ENERGY REVIEWS, 2018, 88 : 258 - 277
  • [3] Sustainable multi-period hub location under uncertainty
    Khaleghi, Amir
    Eydi, Alireza
    SOFT COMPUTING, 2023, 27 (04) : 2009 - 2040
  • [4] A comparison of methods for the optimal design of Distributed Energy Systems under uncertainty
    Karmellos, M.
    Georgiou, P. N.
    Mavrotas, G.
    ENERGY, 2019, 178 : 318 - 333
  • [5] A Novel Approach for Multi-Period Reverse Logistics Network Design under High Uncertainty
    Temur, Gul T.
    Yanik, Seda
    INTERNATIONAL JOURNAL OF COMPUTATIONAL INTELLIGENCE SYSTEMS, 2017, 10 (01) : 1168 - 1185
  • [6] A Novel Approach for Multi-Period Reverse Logistics Network Design under High Uncertainty
    Gül T. Temur
    Seda Yanık
    International Journal of Computational Intelligence Systems, 2017, 10 : 1168 - 1185
  • [7] Operational decisions for multi-period industrial gas pipeline networks under uncertainty
    Cay, Pelin
    Mancilla, Camilo
    Storer, Robert H.
    Zuluaga, Luis F.
    OPTIMIZATION AND ENGINEERING, 2019, 20 (02) : 647 - 682
  • [8] Robust multi-product multi-period supply chain network design model under uncertainty
    Qiu R.
    Xiao X.
    Sun Y.
    Shi S.
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2019, 25 (10): : 2655 - 2665
  • [9] Design of distributed energy systems under uncertainty: A two-stage stochastic programming approach
    Mavromatidis, Georgios
    Orehounig, Kristina
    Carmeliet, Jan
    APPLIED ENERGY, 2018, 222 : 932 - 950
  • [10] Multi-period Charging Infrastructure Planning under Uncertainty: Challenges and Opportunities
    Ye, Qiming
    Bansal, Prateek
    Adey, Bryan
    SUSTAINABLE CITIES AND SOCIETY, 2024, 116