RETRACTED: Robust Two-Stage Location Allocation for Emergency Temporary Blood Supply in Postdisaster (Retracted Article)

被引:52
作者
Luan, Dongqing [1 ]
Liu, Along [2 ]
Wang, Xiaoli [1 ]
Xie, Yanxi [1 ]
Wu, Zhong [2 ,3 ]
机构
[1] Shanghai Univ Engn Sci, Sch Management, Shanghai 201620, Peoples R China
[2] Univ Shanghai Sci & Technol, Business Sch, Shanghai 200093, Peoples R China
[3] Shanghai Univ Int Business & Econ, Sch Management, Shanghai 201620, Peoples R China
关键词
PLATELET PRODUCTION; OPTIMIZATION; MANAGEMENT; EARTHQUAKE; RESOURCE; CHAIN;
D O I
10.1155/2022/6184170
中图分类号
O1 [数学];
学科分类号
0701 ; 070101 ;
摘要
Disaster medical rescue in China mainly adopts the "on-site rescue" model. Whether the location of emergency temporary blood supply sites is reasonable or not directly affects the rescue efficiency. The paper studies the robust location-allocation for emergency temporary blood supply after disaster. First, the factors of several candidate sites were quantified by the entropy-based TOPSIS method, and 12 candidate blood supply sites with higher priority were selected according to the evaluation indicators. At the same time, the uncertainty of blood demand at each disaster site increased the difficulty of decision-making, and then, a robust location model (MIRP) was constructed with minimum cost with time window constraints. It is also constrained by the uncertain demand for blood in three scenarios. Second, the survival probability function was introduced, and the time window limit was given at the minimum cost to maximize the survival probability of the suffered people. Finally, the numerical example experiments demonstrate that the increase in demand uncertainty and survival probability cause the MIRP model to generate more costs. Compared with the three MIRP models, the MIRP-ellipsoid set model gained better robustness. Also, given the necessary restrictions on the time window, the cost can be reduced by about 13% with the highest survival probability. Decision-makers can select different combinations of uncertainty levels and demand disturbance ratios and necessary time constraints to obtain the optimal location-allocation solution according to risk preference and actual conditions.
引用
收藏
页数:20
相关论文
共 32 条
[1]   Robust solutions of uncertain linear programs [J].
Ben-Tal, A ;
Nemirovski, A .
OPERATIONS RESEARCH LETTERS, 1999, 25 (01) :1-13
[2]   The price of robustness [J].
Bertsimas, D ;
Sim, M .
OPERATIONS RESEARCH, 2004, 52 (01) :35-53
[3]   Robust scheduling with budgeted uncertainty [J].
Bougeret, Marin ;
Pessoa, Artur Alves ;
Poss, Michael .
DISCRETE APPLIED MATHEMATICS, 2019, 261 :93-107
[4]  
Codification Committee of Massive Wenchuan Earthquake Sichuan Earthquake Relief Chronicle, 2017, MASS WENCH EARTHQ SI, P6
[5]   Optimized resource allocation for emergency response after earthquake disasters [J].
Fiedrich, F ;
Gehbauer, F ;
Rickers, U .
SAFETY SCIENCE, 2000, 35 (1-3) :41-57
[6]   A stochastic programming approach for floods emergency logistics [J].
Garrido, Rodrigo A. ;
Lamas, Patricio ;
Pino, Francisco J. .
TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2015, 75 :18-31
[7]   A DSS to manage platelet production supply chain for regional blood centers [J].
Ghandforoush, Parviz ;
Sen, Tarun K. .
DECISION SUPPORT SYSTEMS, 2010, 50 (01) :32-42
[8]   Robust timetable optimization for bus lines subject to resource and regulatory constraints [J].
Gkiotsalitis, K. ;
Alesiani, F. .
TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2019, 128 :30-51
[9]  
Guo H.X., 2021, J UESTC SOCIAL SCI E, V23, P39, DOI DOI 10.14071/J.1008-8105(2020)-4016
[10]   Blood platelet production with breaks: optimization by SDP and simulation [J].
Haijema, Rene ;
van Dijk, Nico ;
van der Wal, Jan ;
Sibinga, Cees Smit .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2009, 121 (02) :464-473