Coordinated Scheduling of Berth and Quay Crane Based on MAS

被引:0
|
作者
Zhao, Hui [1 ]
Cheng, Liqin [1 ]
机构
[1] Civil Aviat Univ China, Sch Econ & Management, Tianjin, Peoples R China
关键词
Berth; Quay; Collaborative; Agent;
D O I
暂无
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
In order to improve the efficiency of a container terminal and shorten the turnaround time of ship in harbor, a coordinated scheduling strategy for berth and quay crane allocation based on MAS theory is put forward aiming at the relevance of berth and quay crane scheduling. Berth and quay crane are abstracted as distinct autonomy agent. The scheduling process is based on the interaction among multi agent. Simulation results show that the MAS scheduling strategy behaviors better than the central dispatching strategy.
引用
收藏
页码:328 / 331
页数:4
相关论文
共 50 条
  • [31] Optimal berth allocation, time-variant quay crane assignment and scheduling with crane setups in container terminals
    Turkogullari, Yavuz B.
    Taskin, Z. Caner
    Aras, Necati
    Altinel, I. Kuban
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2016, 254 (03) : 985 - 1001
  • [32] A scheduling method for Berth and Quay cranes
    Young-Man Park
    Kap Hwan Kim
    OR Spectrum, 2003, 25 (1) : 1 - 23
  • [33] A scheduling method for Berth and Quay cranes
    Park, YM
    Kim, KH
    OR SPECTRUM, 2003, 25 (01) : 1 - 23
  • [34] Simulated annealing based simulation optimization method for solving integrated berth allocation and quay crane scheduling problems
    Tasoglu, Gokcecicek
    Yildiz, Gokalp
    SIMULATION MODELLING PRACTICE AND THEORY, 2019, 97
  • [35] Berth Allocation and Quay Crane Assignment Under Uncertainties
    Tan, Caimao
    He, Junliang
    Wang, Yuancai
    TRANSDISCIPLINARY ENGINEERING FOR COMPLEX SOCIO-TECHNICAL SYSTEMS - REAL-LIFE APPLICATIONS, 2020, 12 : 263 - 270
  • [36] The integrated berth allocation, quay crane assignment and scheduling problem: mathematical formulations and a case study
    Abou Kasm, Omar
    Diabat, Ali
    Cheng, T. C. E.
    ANNALS OF OPERATIONS RESEARCH, 2020, 291 (1-2) : 435 - 461
  • [37] Recoverable robustness in weekly berth and quay crane planning
    Iris, Cagatay
    Lam, Jasmine Siu Lee
    TRANSPORTATION RESEARCH PART B-METHODOLOGICAL, 2019, 122 : 365 - 389
  • [38] A proactive approach for simultaneous berth and quay crane scheduling problem with stochastic arrival and handling time
    Han, Xiao-le
    Lu, Zhi-qiang
    Xi, Li-feng
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2010, 207 (03) : 1327 - 1340
  • [39] A follow-up survey of berth allocation and quay crane scheduling problems in container terminals
    Bierwirth, Christian
    Meisel, Frank
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2015, 244 (03) : 675 - 689
  • [40] Solving the Continuous Berth Allocation and Specific Quay Crane Assignment Problems with Quay Crane Coverage Range
    Li, Feng
    Sheu, Jiuh-Biing
    Gao, Zi-You
    TRANSPORTATION SCIENCE, 2015, 49 (04) : 968 - 989