Scheduling optimization under uncertainty - an alternative approach

被引:85
作者
Balasubramanian, J [1 ]
Grossmann, IE [1 ]
机构
[1] Carnegie Mellon Univ, Dept Chem Engn, Pittsburgh, PA 15213 USA
基金
美国国家科学基金会;
关键词
scheduling; uncertainty; fuzzy numbers; MILP models; tabu search; flowshop plants; new product development;
D O I
10.1016/S0098-1354(02)00221-1
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
The prevalent approach to the treatment of processing time uncertainties in production scheduling problems is through the use of probabilistic models. Apart from requiring detailed information about probability distribution functions, this approach also has the drawback that the computational expense of solving these models is very high. In this work, we present a non-probabilistic treatment of scheduling optimization under uncertainty, where we describe the imprecision and uncertainty in the task durations using concepts from fuzzy set theory. We first provide a brief review on the fuzzy set approach, comparing it with the probabilistic approach. We then present mixed integer linear programming (MILP) models derived from applying this approach to two different problems-flowshop scheduling and new product development process scheduling-and show how they can be used to predict most likely, optimistic and pessimistic values of metrics such as the makespan. Results indicate that these MILP models are computationally tractable for reasonably sized problems. We also describe tabu search implementations in order to handle larger problems. (C) 2002 Elsevier Science Ltd. All rights reserved.
引用
收藏
页码:469 / 490
页数:22
相关论文
共 48 条
[21]   GENETIC ALGORITHMS AND NEIGHBORHOOD SEARCH ALGORITHMS FOR FUZZY FLOWSHOP SCHEDULING PROBLEMS [J].
ISHIBUCHI, H ;
YAMAMOTO, N ;
MURATA, T ;
TANAKA, H .
FUZZY SETS AND SYSTEMS, 1994, 67 (01) :81-100
[22]   Planning and scheduling of parallel semicontinuous processes .2. Short-term scheduling [J].
Karimi, IA ;
McDonald, CM .
INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 1997, 36 (07) :2701-2714
[23]   A THEORY OF DESIGN RELIABILITY USING PROBABILITY AND FUZZY-SETS [J].
KUBIC, WL ;
STEIN, FP .
AICHE JOURNAL, 1988, 34 (04) :583-601
[24]   STOCHASTIC AND FUZZY PERT [J].
LOOTSMA, FA .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1989, 43 (02) :174-183
[25]  
MAJOZI T, 2001, AICHE ANN C REN
[26]  
MALCOLM DG, 1959, OPER RES, V12, P16
[27]   FUZZY JOB SEQUENCING FOR A FLOW-SHOP [J].
MCCAHON, CS ;
LEE, ES .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1992, 62 (03) :294-301
[28]   The flow shop with parallel machines: A tabu search approach [J].
Nowicki, E ;
Smutnicki, C .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1998, 106 (2-3) :226-253
[29]   FILTERED BEAM SEARCH IN SCHEDULING [J].
OW, PS ;
MORTON, TE .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1988, 26 (01) :35-62
[30]   Optimal fuzzy counterparts of scheduling rules [J].
Özelkan, EC ;
Duckstein, L .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1999, 113 (03) :593-609