Three stage no-idle flow-shops

被引:43
作者
Saadani, NE
Guinet, A
Moalla, M
机构
[1] Fac Sci Tunis, Lab LIP2, Dept Informat, Tunis 1060, Tunisia
[2] INSA, Lab PRISMa, Dep GPR, F-69621 Villeurbanne, France
关键词
scheduling; permutation flow-shop; no-idle machines; Johnson's rule;
D O I
10.1016/S0360-8352(02)00217-6
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
The three stage no-idle flow-shop configuration, where machines work continuously without idle intervals, is an interesting manufacturing environment in many industries. Few researches have investigated this type of systems. The idle characteristic is a very strong constraint and it affects seriously the value of makespan (C max) criterion. We treat here the scheduling problem of three stage permutation flow-shop configuration with no-idle machines in order to minimise the makespan F3/no-idle/C max. An easily implementing heuristic is proposed to solve this problem with O(n log n) complexity. It finds optimal solutions for several cases. A computational study shows the result quality. (C) 2002 Elsevier Science Ltd. All rights reserved.
引用
收藏
页码:425 / 434
页数:10
相关论文
共 12 条
[1]   FLOWSHOP NO-IDLE OR NO-WAIT SCHEDULING TO MINIMIZE THE SUM OF COMPLETION TIMES [J].
ADIRI, I ;
POHORYLES, D .
NAVAL RESEARCH LOGISTICS, 1982, 29 (03) :495-504
[2]  
Baptiste P., 1997, P INT C IND ENG PROD, V97, P429
[3]  
Garey M. R., 1976, Mathematics of Operations Research, V1, P117, DOI 10.1287/moor.1.2.117
[4]   NP-hardness of compact scheduling in simplified open and flow shops [J].
Giaro, K .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2001, 130 (01) :90-98
[5]  
*INCOTEC, 1999, INCOPLAN PROG ORD PA
[6]  
Johnson Selmer Martin., 1954, NAV RES LOG, V1, P61, DOI [10.1002/nav.3800010110, DOI 10.1002/NAV.3800010110, 10.1002/(ISSN)1931-9193]
[7]   SCHEDULING IN A 2-STAGE MANUFACTURING PROCESS [J].
NARASIMHAN, SL ;
PANWALKAR, SS .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1984, 22 (04) :555-564
[8]   A COMPARISON OF SEQUENCING RULES FOR A 2-STAGE HYBRID FLOWSHOP [J].
NARASIMHAN, SL ;
MANGIAMELI, PM .
DECISION SCIENCES, 1987, 18 (02) :250-265
[9]  
Pinedo M., 1995, Scheduling: Theory, Algorithms, and Systems, V2nd
[10]  
SAADANI H, 2001, P INT C IND ENG PROD, V2, P880