摘要
In this paper, we address the hybrid flow shop scheduling problem with multiprocessor tasks. The objective is to minimize the maximum completion time. This problem is encountered in manufacturing, parallel and distributed computing, and real-time machine vision systems. This problem is strongly NP-hard, and consequently, several heuristics and meta heuristics were proposed in the literature in order to provide a near optimal solution. Assessing the performance of these heuristics requires efficient lower bounds. Surprisingly, few lower bounds with moderate performance were proposed. Because of this reason, we propose in this paper a new efficient destructive lower bound. This lower bound is based on the concept of revisited energetic reasoning, which is basically a feasible test with window time adjustments. The efficiency of the proposed lower bound is assessed throughout an extensive computational experiments conducted on a benchmark of 2,100 instances with up to ten centers. The numerical results provide evidence that the proposed lower bound consistently improves the best existing ones.
引用
收藏
页码:6121 / 6133
页数:13
相关论文
共 54 条
[1]   A comparison of heuristics for scheduling multiprocessor tasks on three dedicated processors [J].
Amoura, AK ;
Bampis, E ;
Manoussakis, Y ;
Tuza, Z .
PARALLEL COMPUTING, 1999, 25 (01) :49-61
[2]  
[Anonymous], 1991, Revue d'Intelligence Artificielle
[3]  
[Anonymous], 1998, SCHEDULING ALGORITHM
[4]   The energy scheduling problem: Industrial case-study and constraint propagation techniques [J].
Artigues, Christian ;
Lopez, Pierre ;
Hait, Alain .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2013, 143 (01) :13-23
[5]   Satisfiability tests and time-bound adjustments for cumulative scheduling problems [J].
Baptiste, P ;
Le Pape, C ;
Nuijten, W .
ANNALS OF OPERATIONS RESEARCH, 1999, 92 (0) :305-333
[6]   A genetic algorithm for an industrial multiprocessor flow shop scheduling problem with recirculation [J].
Bertel, S ;
Billaut, JC .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2004, 159 (03) :651-662
[7]   Lower bounds for resource-constrained project scheduling problems [J].
Brucker, P ;
Knust, S .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2003, 149 (02) :302-313
[8]   Polynomial algorithms for resource-constrained and multiprocessor task scheduling problems [J].
Brucker, P ;
Kramer, A .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1996, 90 (02) :214-226
[9]   A linear programming and constraint propagation-based lower bound for the RCPSP [J].
Brucker, P ;
Knust, S .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2000, 127 (02) :355-362
[10]   New reduction procedures and lower bounds for the two-dimensional bin packing problem with fixed orientation [J].
Carlier, Jacques ;
Clautiaux, Francois ;
Moukrim, Aziz .
COMPUTERS & OPERATIONS RESEARCH, 2007, 34 (08) :2223-2250